Laserfiche WebLink
-66- <br />X <br />rical Information and Rir Resources - Rules 2. <br />4(2)!h). 2.05.6!1), and 4 <br />The required climatological information is presented on pages 2.09-33 through <br />2.04-39 of the Bear No. 3 application. Bear Coal Company has requested a transfer <br />of operators from the Air Pollution Control Division for an Initially Approved <br />emission permit for the Anchor Mine, site of the proposed Bear No. 3 Mine. The <br />permit is included in Exhibit 4 of the revision application. <br />The applicant proposes to periodically water roads to supress dust. The Crushing <br />and Conveying operations will be equipped with a water spraying system, and all <br />conveyors will be partially enclosed. <br />The proposed operation is in compliance with the requirements of this section. <br />