Laserfiche WebLink
-''-s- <br />?:7iIlI. Operation on Lands Subject of Limitations or-Prohibitions - <br />Rules 2.03.7 and 2.10 <br />The proposed operation is in compliance ~:ith the requirements of this section, <br />and Rule 2.07.6(2)(d) for the following reasons: <br />1. The permit area of the proposed operation. is not within: <br />a. an area designated unsuitable for caning; <br />b. an area under studs for designat`_on as unsuitable for surface coal <br />mining; <br />c. on any lands subject to prohibitions or limitations; <br />d. within 30U feet from any occupied dwelling. <br />?aIF. Demonstration that Surface Coal *iinin= and Reclamation Operations <br />can be Feasibly Accomplished - Pule 2.07.6(2)(b) <br />Contigent upon the satisfactory resolution of stipulations presented in <br />this findings document, the following finding of compliance is presented. <br />Pursuant to Rule 2.07.6(21(b) the Division f'_nds, based on information in <br />the application and from all available sources, that surface coal mining and <br />reclamation operations can be feasibl•: accer..~lished under the mining and <br />reclamation plan contained in the application. <br />??a'. Compatibility with Anticipated Adjacent Operations - Rule 2.07.6(2)(1) <br />Pursuant to Rule 2.07.6(2)(ij the Division `finds that the *icClane Cantor. <br />operation will not be inconsistent with other operations anticipates to be <br />performed in areas adjacent to the proposes permit area. <br />~'1Z'I. Reclamation Fees Required b~- 30 CFF, Chapter ~'II, Subchapter R - <br />Rule 2.07.6(2)(0) <br />5ased.on communication with OS*1 personnel, pursuant to Rule 2.07.6(2)(0) the <br />Division. finds that the applicant is in compliance with the payment of <br />reclamation fees. All reclamation fees required b?• 30 CFP., Chapter PiI, <br />Subchapter R have been paid. <br />