Laserfiche WebLink
6 <br />letter should be prepared by the operator which <br />outlines the cause of the MZT failure and proposes a <br />potential course of action. This report should be <br />submitted to EPA within five days. <br />15. Hleed off well into a bucket, if possible, to obtain a <br />volume estimate. This should be comQared to the <br />calculated value obtained using the casing/tubing <br />annulus volume and fluid compressibility values. <br />16. Retuzn to office and prepare follow-up. <br />Attachment <br />