Laserfiche WebLink
CC&L' Gold Mng. ID: MRR 26'96 21:22 No .034 P.O1 <br />• III IIIIIIIIIIIII III <br />C ~ Cripple Creek And Victor Gold Mlning Company 999 <br />A Joint Venture - Plky Pok Mining Company, Manapor <br />~~ Operetlon^ Olllce Englewood Olllee - <br />P.O. Box 191, 27b5 Stale Highway 67 P.O. Box 5076, 5251 DTC Parkway, Suite 700 <br />Victor, CO 80880 Englcwootl. CO 80155 <br />(719) 689.2977 • FAX (779) 869-3254 (303) 669-A700 • FAX (303) 869-0707 <br />March 27, 1996 <br />SENT BY FACSIMILE & OVERNIGHT RECORDED DELIVERY <br />Mr. Berhan Keffelew <br />Environmental Protec[ion Specialist <br />Colorado Department of Natural Resources <br />Division of Mines and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Rootn 215 <br />Denver, Colorado 80203 <br />Reference: Cresson Project: Permit M-80-244: Correction of Reference to Testin8 Method. <br />~TOtlate on Assessment of Underground Workings. and Construction Schedule. <br />Dear Mr. Keffelew: <br />The Cripple Creek & Victor Gold Mining Company is providing, as Attachment I, corrected <br />pages for the geomembrane specifications that should be inserted in your copy of the Technical <br />Specifications. Accompanying these corrected pages is an explanation from the Design Engineer <br />for the correction. The telling procedure involved is that for Lineat Low Density Polyethylene <br />("LLDPE") puncture resistance. With focus on submitting the test results to your Office, a <br />typographical or editing error was not identified until the synthetic geomembrane contract was <br />finalized. The correct resting procedure is that described in ASTM D4833. <br />Tltc second attacltmcnt is status report on the investigations of, and compensation measures for, <br />the supposed underground workings that were historically mapped as located in areas of the <br />Phase Il pad. 'this is provided to ensure that you are updated on the progress and plans. As <br />you will see described and analyzed in the Design Ettginccr's report, we currently intend to <br />install geogrid material to ensure that the workings are properly addressed. Additional pages <br />for the Technical Specifications that call out the geogrid materials and procedures are included. <br />1fie map that accanpanies Attachment 2 is provided with the hard copy of this letter. <br />The third of the referenced items is that of the 1996 construction schedule. This schedule is <br />somewhat dependent on obtaining Office of Mined Land Reclamation approval of the technical <br />revisions and other notifications CC&V provided initially via its letter dated January 9, 1996. <br />It is our understanding that we should receive an "adequacy letter" from you that addresses <br />CC&V's response of Marclt 4, 1996, possibly tomorrow, It is also our understanding that all <br />remaining issues raised by the Office of Mined Land Reclamation involve the Drain Cover Fill. <br />CC&V also acknowledges that a cation exchange test for the "Arta 2" Soil Liner Pill must be <br />submitted to your office and that the thickness of the Low Volume Solution Collection System <br />Fill is not changing. based on these understandings, it is our belief that the other (than Drain <br />Cover Fill) elements of the Technical Revision submitted to you on January 9, 1996 are <br /> <br />