, <br />G,•037-81 <br />GEC MINEFALS, Inc. <br />permit Application Stipulations ar.d Proposed Actions REVISED: 12-3-1982 <br />Page ~ of ~ Pages <br /> LIST OF STIPULATIONS DEADLINE PLAN OF ACTION <br />14. <br />X Three months <br />prior to construction of the access road to t nee most s prior <br />A local surveying company, Great Divide Engineering, has been <br /> Pond F, plans for this access road certified by a registered (Established by arranged and field work will be completed by the latter part <br /> professional engineer must be submitted to the Division in GE[. Minerals) of September 1982. Access road information to Pond F will <br /> accordance with the requirements of Rule 4.03.2. Division be ready to submit b_- 1-22-83. <br /> approval for construction of this access road must be ottained • <br /> prior to any construction of this structure. <br />x:d. The applicant must confirm that reclamation delineated in 1-3-£3 A field survey has been accomplished as planned, a draft <br /> Phase i has been accomplished. This must include one transect drawing will be ready by 9-14-72., the final drawing will be <br /> across the post-mining surface demonstrating that the proposed ready by i-3-83 t~ make sure the actual post mining conto~~r <br /> surface topography has been accomplished. This confirmation matchzs the proposed post-mining topography. <br /> must be submitted to the Division prior to submitting the Bond. <br /> A Performance Bond in the amount of $550,259.00, payable to the 12-3-82 If no complaint has been filed by 9-12-82, GEC will deliver <br /> State of Colorado, must be fi1eC with the division within the Perfortrance 2ond in the amount of 5550,259.00 payable <br /> 30 days following final approval of this proposed decision to to the State of Colorado by 12-3-~2. <br /> approve the permit. <br />17. Each scheduled incremental bond amount must be filed with the 3-1-83 Performance Bond Schedule will be `filed with the State kinea <br /> Division at least thirty (30) days prior to the commencement (Fh3se III) Land Reclamation Division as follows: <br /> of surface coal mining and reclamation operations in the 3-1-84 Phase III - S °_29,981 <br /> incremental area corresponding to that bond amount. Confirms- (Pi;ase IV) Phase IV - 51,057,459 <br /> tion that reclamation schedule in the previous phase or incre- 4-1-85 Phase v - X1,3'.5,326 <br /> ment must accompany the bond amount submitted to the Division. (Phase V) <br /> "he applicant must identify on Map 17, Pre-mining Topography, 3-3-83 Identification and ma?ping of the steep slope areas within *_hz <br /> all of the areas that fall under the category of steeF slope entire permit boundary along the proposed minis? phases and <br /> mining. The steep slope category doES not apply to areas tr:at and their surroundings will 6e completed b) 3_1-83. <br /> that have been over-steepened by .previous mininc_. The applicant ,. <br /> must then demonstrate compliance with Rule 4.27 for the identi- <br /> fied steep slope areas. The map and demonstration must be sub- <br /> mitted to the Division within 120 days of permit issuance. <br /> <br />