Laserfiche WebLink
;033-81 <br />E'C MINERALS, Inc. <br />'ermit Application Stipulations and Proposed Actions <br />,ge 2 of 4 Pages <br />REVISED: 12-3-1982 <br /> <br /> LIST OF STIPULATIONS DEADLINE PLAN OF ACTION <br /> GEC Minerals, Inc., shall construct the proposed crossing of 11-12-82 A six foot culvert has been ordered by GEC. It is esti- <br /> Newlin Creek as shown on Drawing 16 within 60 days of permit (Construction) mated that three days v+ill be required to accomplish the <br /> issuance and shall provide a statement that construction meets 2_3_83 entire construction job as designed. During and after the <br /> the design requirements of Attachment M and Drawing 16 cer- <br />(Certified) construction a local surveyor will be arranged to ensure <br /> tified by a qualified registered professional engineer within the construction is accurate and will meet the design and <br /> 30 days of completed construction. 3-3-83 criteria established. A certificate can he obtained after <br /> Prior to mining that time. <br /> proposed date <br /> Prior to mining .in the "North Area" (as shown on Map 15 of 6-1-83 A hydrologicconsul*_ant will be contacted to prepare for tine <br /> Permit Application), baseline ground water monitoring must (Plan Submitted) baseline ground water monitoring. This report v+ill be sub- <br /> be conducted and submitted to the Division. The monitoring mitted to the State prior to exploratory drilling in the <br /> plan must be approved by the Division prior to the drilling 10-1-83 <br />(AFprcval) North Area. <br /> of the exploration drill holes. <br />~. The topsoil series of Noden and Tecclote Sandy Loam must be 3-3-33 David L. Patch, soils consultant, will collect the necessary <br /> analyzed and the analysis submitted to the Division witl'in soil samples from the North Area and send out for analysis <br /> 90 deys of permit issuance. - by 2-3-"3 This analysis shall be submitted to the State <br /> b~ 3-3-fig. <br />?~ The topsoil/subsoil mass balance must be reevalutaed, taking 4-3-23 Right after the depths of each type of topsoil/subsoil leave <br /> into account the depths of soil salvage for each phase of been determined, the preparation/reevaluation nT the topsoil/ <br /> mining for each soil type, the resultant cc•bic yardage of subsoil mass balance shall commence. This .vile include soil <br /> material and the proposed location for stockpiles. The depth type, yardage for each phase and the proposed locations rr'or <br /> of sail to be redistributet must then be revised. The revised stockpiles. <br /> topsoil handling plan must be submitted to the Division ~•+ithin <br /> 120 days of permit issuance. <br /> <br />