Laserfiche WebLink
<br /> <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1317 Sherman 51., Ruom 21 5 <br />Denver, Colorado A0203 <br />Phone: 13037 856-3557 <br />FAY.1303) 83'_8106 <br />March 5, 1998 <br />Ruy Romer <br />Governor <br />Office of Surface Mining <br />1999 Broadway, Suite 3320 <br />Denver, Colorado 80202 <br />Mr. Henry Austin <br />Western Regional Coordinating Center <br />Re: Special Focus Inspection, Bowie No. 1 Mine, Permit No. C-81-038, Bowie <br />Resources Ltd. <br />Dear Mr. Austin: <br />~1 <br />~~ <br />DEPARTMENT OF <br />NATURAL... <br />RESOURCES <br />lames 5 Lochhead <br />EaecW me DueUOr <br />michael B. Long <br />Division Dveaor <br />The Division wishes to take this opportunity to summarize the progress in resolving the <br />outstanding issues from the coal refuse pile Special Focus Inspection of the Bowie No. 1 <br />Mine, which was conducted on August 19, 1997. Bowie Resources Limited (BRL) is the <br />permittee of the mine. At that inspection, Ron Sassaman and Glen Golden represented the <br />Office of Surface Mining (OSM). The following is a list of the outstanding issues, and the. <br />current status of their resolution. These issues were taken from the OSM Mine-Site <br />Evaluation Inspection Report, dated September 15, 1997, as well as from the Division of <br />Minerals and Geology (DMG) Coal Inspection Report, issued August 28, 1997. <br />There was a question as to whether or not the SEDCAD ditch designs in the permit <br />application included freeboard. <br />The SEDCAD designs were examined by DMG and it was determined that the <br />ditch dimensions listed in the permit application include the required freeboard. <br />DMG believes that this issue has been resolved. <br />OSM stated that clarification was needed as to whether or not a toe bench, <br />measuring at least 10 feet by 45 feet, was required at the toe of the waste pile of <br />the east addition of the West Ridge waste pile, in the vicinity of the underdrain. <br />During the special focus inspection, the toe bench had not been observed. <br />III IIIIIIIIIIIII III <br />STATE OF COLv«UU <br />