My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32632
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:04 PM
Creation date
11/23/2007 7:22:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
General Documents
Doc Date
3/27/1997
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN3
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STIPULATION N0. 13: <br />AT LEAST 90 DAYS PRIOR TO INITIATION OF POND CONSTRUCTION THE PERMITTEE WILL <br />SUBMIT A TECHNICAL REVISION INCLUDING DESIGN INFORMATION FOR THE SIX PROPOSED <br />STOCK PONDS, DEMONSTRATING COMPLIANCE WITH THE REQUIREMENTS OF RULE <br />4.05.9(1). THE DESIGN INFORMATION MUST INCLUDE THE FOLLOWING: <br />1. AN OUTLINE OF THE DRAINAGE AREA FOR EACH POND. <br />2. A CONSERVATIVE ESTIMATE OF ANNUAL SEDIMENT VOLUMES FOR EACH POND. <br />3. PEAK FLOW CALCULATIONS AND ACCOMPANYING ASSUMPTIONS DOCUMENTING THAT <br />RUNOFF FROM A 25-YEAR, 24-HOUR STORM CAN BE PASSED THROUGH THE EMERGENCY <br />SPILLWAY OF COMBINATION OF PRINCIPAL AND EMERGENCY SPILLWAYS FOR EACH <br />POND. <br />4. DIMENSIONS AND LOCATION OF THE CUTOFF TRENCHES. <br />5. THE SOURCE AND TYPE OF MATERIAL TO BE USED IN THE CUTOFF TRENCHES AND THE <br />EMBANKMENTS. <br />6. THE ELEVATION OF THE EMBANKMENTS AND THEIR WIDTHS. <br />7. THE CREST INVERT ELEVATION OF THE EMERGENCY SPILLWAYS, THEIR HEIGHT AND <br />THEIR SHAPES. <br />8. THE SPECIFICATIONS (MATERIAL, GAUGE, SIZE, LOCATION, ELEVATION) OF THE <br />PRIMARY DEWATERING DEVISE AND THE LOCATIONS AND DIMENSIONS OF ANTI-SEEP <br />COLLARS. <br />9. A DESCRIPTION OF FOUNDATION PREPARATION AND FILL PLACEMENT ACTIVITIES AS <br />WELL AS THE EXPECTED CONSTRUCTION SCHEDULE. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.