Laserfiche WebLink
10:30 SF33 This site lies at the end of the spur road and <br />is currently completed as a monitoring well. <br />It will require sealing and pad reclamation. <br />The spur road which accesses SF3, SF32, SF4, and SF33 needs a <br />minimal amount of work to accomplish final reclamation. <br />Appropriate measures should be taken to eliminate the road as a <br />channel for water and drainage should be restored as necessary to <br />eliminate future erosional problems. <br />11:20 GE9c/GE10 These sites lie along a road which branches <br />off a pre-existing road at site GE22 and <br />includes site. GE11. This spur road will be <br />reclaimed and the steep, lower section will <br />require some earthwork and drainage work. The <br />sites are reclaimed and need no further <br />attention. <br />Also find attached a Coal Exploration Final Report Reclamation <br />Report form which is required to be completed when reclamation <br />activities are completed. <br />Again, in general, previous exploration reclamation activities <br />appear to have produced excellent results. Continued use of past <br />practices will likely produce similar results. Your effort and <br />diligence in completing your exploration reclamation plan is <br />appreciated. The Division looks forward to working with you to <br />accomplish reclamation and exploration bond release. <br />If you have questions or comments, please call me. <br />S i n~l~ ///f I <br />Kent A. Gorham <br />Environmental Protection Specialist <br />cc: Dan Hernandez, DMG <br />