-3- <br />Stipulation No. 4 <br />SALT CREEK MINING COMPANY SHALL INSTALL AND MONITOR THE PROPOSED <br />MONITORING WELL GW-6 ONE YEAR PRIOR TO THE CONSTRUCTION OF THE <br />HUNGER CANYON MINE WASTE ROCK PILE, WATER QUALITY SAMPLES AND <br />WATER LEVELS SHALL BE TAKEN QUARTERLY. MONITORING SHALL BE SUB- <br />MITTED TO THE REGULATORY AUTHORITY QUARTERLY. <br />Stipulation No. 5 <br />THE APPLICANT SHALL NOT MINE MORE THAN 100,000 TONS OF COAL ANNUALLY <br />UNTIL THEY HAVE OBTAINED A REVISED AIR QUALITY PERMIT FROM THE <br />COLORADO DEPARTMENT OF HEALTH FOR THE HIGHER PRODUCTION LEVEL. <br />Stipulation No. 6 <br />WITHIN 6 MONTHS OF PERMIT ISSUANCF,, THE PERMITTEE MUST PROVIDE THE <br />REGULATORY AUTHORITY WITH AN ANALYSIS OF THE FILL (DISTURBED LANDS) <br />AND ANY OTHER DISTURBED MATERIAL WHICH WILL NOT BE TOPSOILED PRIOR <br />TO REVEGETATION, THIS ANALYSIS WILL BE DONE ON AN APPROPRIATE NUMBER <br />OF REPRESENTATIVE SAMPLES TAKEN TO A DEPTH OF AT LEAST 9 FEET, AND <br />WILL INCLUDE ALL REQUIRED PARAMETERS FOR R DETERMINATION OF SUIT- <br />ABILITY FOR RECLAMATION. <br />Stipulation No. 7 <br />TOPSOIL MUST BE ANALYZED FOR FERTILIZER ELEMENTS PRIOR TO SEEDING. <br />IF THE SOIL IS FOUND TO BE PHOSPHOROUS-DEFICIENT, PHOSPHOROUS MUST <br />BE INCORPORATED INTO THE TOPSOIL DURING THE RESPREADING PROCESS. <br />ANY OTHER FERTILIZER ELEMENTS WHICH ARE DEFICIENT IN THE TOPSOIL <br />MAY BE ADDED AFTER ONE YEAR'S GROWTH OF VEGETATION AT R TIME OF <br />YEAR APPROVED BY THE DIVISION. <br />Stipulation No. B <br />WITHIN ONE YEAR OF PERFIIT ISSUANCE, THE PERMITTEE WILL SUBf-0IT A <br />PLAN TO THE REGULATORY AUTHORITY FOR SURFACE MANIPULATION OF THE <br />SOILS TO ENHANCE MOISTURE RETENTION AND REDUCE EROSION DURING <br />RECLAMATION. THIS PLAN WILL BE REVIEWED BY THE DIVISION AND <br />INITIATED BY THE PERMITTEE DURING RECLAMATION. <br />Stipulation No. 9 <br />THE PERMITTEE SHALL RESAMPLE THE HUNGER CANYON BIG SAGEBRUSH <br />COMMUNITY FOR PRODUCTION DURING THE 1983 GROWING SEASON. THE <br />SAMPLING SHALL BE OF AN INTENSITY TO MEET SAMPLE ADEQUACY <br />REQUIREMENTS OF THE DIVISION. THE RESULTS OF THE SAMPLING <br />SHALL BE SUBMITTED TO THE REGULATORY AUTHORITY NO LATER THAN <br />30 DAYS AFTER THE COMPLETION OF SAMPLING AND BEFORE SEPTEMBER <br />30, 1983. <br />