Laserfiche WebLink
<br />STIPULATION N0. 3 , <br />CYCC IS MONITORING WATER QUALITY AT UPSTREAM SITE 18 ON MIDDLE CREEK AC- <br />CORDING TO THE SCHEDULE IN TABLE B OF EXHIBIT 15. THE AIVISION DIRECTS <br />THAT THE PERMITTEE ALSO MONITOR WATER QUALITY ON FOIDEL CREEK UPSTREAM OF <br />THE MINE ACCORDING TO THE SAME SCHEDULE. THIS MONITORING SITE MUST BE <br />LOCATED UPSTREAM NEAR THE WESTERN PERMIT BOUNDARY AND MAP 4A MUST BE RE- <br />VISED WITHIN 30 DAYS OF PERMIT ISSUANCE TO SHOW THE LOCATION. THE MONI- <br />TORING INFORMATION FROM FOIDEL CREEK SHALL BE INCLUDED IN THE PERMITTEE'S <br />ANNUAL HYDROLOGIC MONITORING REPORT TO THE DIVISION. <br />Response: Monitoring of water quality on Foidel Creek upstream from <br />Mine No. 3 will be conducted at Site 60, as shown on revised Map 4A, <br />Mine No. 3 Hydrology. This site will be sampled on the same sche- <br />dule as other surface water monitoring sites at Mine No. 3. Data <br />from Site 60 will be submitted in annual monitoring reports. <br />/i <br />