My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32511
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32511
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:01 PM
Creation date
11/23/2007 7:20:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987038
IBM Index Class Name
General Documents
Doc Date
6/30/1993
Doc Name
PURPOSE OF PUBLIC NOTICE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PA. I <br />Page 24 of 40 <br />Permit No.: CO-0034665 <br />C. S i is Limitations and Self-Monitoring Requirement:3 <br />6. Releases of Storm Water in Excess of Reportable <br />Quantities. <br />a. The discharge of hazardous substances or oil in the <br />storm water discharge(s) from a facility shall be <br />prevented or minimized in accordance with the <br />applicable storm water pollution prevention plan for <br />the facility. This permit does not relieve the <br />permittee of the reporting requirements of 40 CFR <br />Part 117 and 40 CFR Part 302. Except as provided in <br />Part I.C.6.b. {multiple anticipated discharges) of <br />this permit, where a release containing a hazardous <br />substance in an amount equal to or in excess of a <br />reporting quantity established under either 40 CFR <br />117 or 40 CFR 302, oc ~ rs during a 24-hour period: <br />(1) The discharger is required to notify the <br />National Response Center (NRC) (800-424-8802; in <br />the Washington, DC metropolitan area <br />202-426-2675-) in accordance with the <br />requirement's of 40 CFR 117 and 40 CFR 302 as <br />soon as he or she has knowledge of the <br />(2) The s orm water pollution prevention plan <br />requ"red under Part I.C.4. (storm water <br />r,, pol ution prevention plans) of this permit must <br />,y. bedmodified within 14 calendar days of knowledge <br />~ the release to: provide a description of the <br />! ~ elease, the circumstances leading to the <br />~, ~ release, and the date of the release. In <br />addition, the plan must be reviewed by the <br />' permittee to identify measures to prevent the <br />reoccurrence of such releases and to respond to <br />~' j ~ such releases, and the plan must be modified <br />,J where appropriate; and, <br />~~ ` (3) The permittee shall submit within 14 calendar <br />days a written description of knowledge of the <br />,j / release of: the release (including the type and <br />(/ estimate of the amount of material released), <br />the date that such release occurred, the <br />circumstances leading to the release, and steps <br />to be taken in accordance with Part I.C.6.a.(2) <br />(above) of this permit to the appropriate EPA <br />Regional Office at the address provided in Part <br />II.D. (reporting: where to submit) of this <br />permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.