My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32511
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32511
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:01 PM
Creation date
11/23/2007 7:20:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987038
IBM Index Class Name
General Documents
Doc Date
6/30/1993
Doc Name
PURPOSE OF PUBLIC NOTICE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• P~ I <br />Page 13 of 40 <br />Permit No.: CO-0034665 <br />C. <br />Specific Limitations and Self-MOnitorina Req~rements <br />4. Storm Water Pollution Prevention Plan <br />A storm water pollution prevention plan shall be <br />developed for this facility. The storm water pollution <br />prevention plan shall be prepared in accordance with <br />good engineering practices and in accordance with the <br />factors outlined in 40 CFR 125.3(d)(2) or (3) as <br />appropriate. The plan shall identify potential sources <br />of pollution which may reasonably be expected to affect <br />the quality of storm water discharges associated with <br />industrial activity from this facility. In addition, <br />the plan shall describe and ensure the implementation of <br />practices which are to be used to reduce the pollutants <br />in storm water discharges associated with industrial <br />activity at the facility and to assure compliance with <br />the terms and conditions of this permit. Facilities <br />must implement the provisions of the storm water <br />pollution prevention plan required under this Part as a <br />condition of this permit. <br />a, Deadlines for Plan Preparation and Compliance. <br />(1) The plan for a storm water discharge associated <br />with industrial activity: <br />(a) shall be prepared {and updated as <br />appropriate); and shall provide for <br />implementation and compliance with the <br />terms of the plan on or before the date six <br />months after the effective date of this <br />permit. <br />b. Signature and Plan Review <br />(1) The plan shall be signed in accordance with Part <br />IV.G. (signatory requirements), and be retained <br />on-site at the facility which generates the <br />storm water discharge in accordance with Part <br />II.G. (retention of records) of this permit. <br />(2) The permittee shall make plane available upon <br />request to the Director, or authorized <br />representative, or in the case of a storm water <br />discharge associated with industrial activity <br />which discharges through a municipal separate <br />storm sewer system, to the operator of the <br />municipal system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.