My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32420
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:59 PM
Creation date
11/23/2007 7:18:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
6/28/1990
Doc Name
Proposed Decision & Findings of Compliance for PR1
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />XYI. Explosives - Rules 2.05.3(6) and 4.08 <br />The requirements of this section do not apply to this operation, since no <br />explosives will be used at the surface. <br />XVII. Backfilling and Grading - Rules 2,05.3(5), 2.05.3(9), 2.05.4 (2)(a) <br />c an <br />The information on backfilling and grading can be found in Volume I, <br />page 2.05-22 of the application. This information is partially in <br />response to Stipulation No. 22 and satisfies Stipulation No. 22. <br />The operation is in compliance with the requirements of this section. <br />XYIII, Coal Processing Waste and Non-Coal Processing Waste - Rules 2.05.3(8) <br />rrrG-~n rrm--~r-rrr-~ <br />Information on coal processing water and C-CPW can be found on <br />pages 2.05.19. A technical revision (04) to expand the Ciruela Canyon <br />Waste Pile was approved with six stipulations on August 13, 1987, <br />All the stipulations have been satisfied. <br />XIX. tAine Facilities, Coal Handling Structu <br />u es an <br />Facilities - <br />A description of the mine and support facilities can be found on <br />page 2.05-7 and a list of the facilities on page 2,05-8, Table 16. The <br />coal handling structures are also disassed on page 2.05-18. The <br />operation is in compliance with the requirements of this section. <br />XX. Roads - Rules 2.05.3(3) and 4.03 <br />Information pertaining to the roads at Golden Eagle Mine is found on <br />pages 2.05-7 and 9 and Map 10. All stipulations relating to roads <br />(25, 26, and 27) have been satisfied. <br />The operation is in compliance with the requirements of this section. <br />The total amount of the Golden Eagle mine bond is 5940,578.20. The total <br />bond on hand is 5940,578.20 which gives them a surplus of 537,259.20. A <br />detailed breakdown of the bond can be found in Exhibit 19 of the <br />application. <br />The operation is in compliance with the requirement of this section, <br />XXI. Bonding <br />The total amount of the Golen Eagle mine bond is 5903,319.00. The total <br />bond on hand is 5940,578.20 which gives them a surplus of 537,259.20. A <br />detailed breakdown of the bond can be found in Exhibit 19 of the <br />application. The operation is in compliance with the requirements of <br />this section. <br />-31- <br />
The URL can be used to link to this page
Your browser does not support the video tag.