My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32315
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:56 PM
Creation date
11/23/2007 7:15:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
7/8/1982
Doc Name
CLARIFICATION OF BEAR 3 STIPULATION RESPONSE
From
ACZ INC
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' htr. Dan Mathews Page Five <br />July 8, 1982 <br />1 <br />2. As recommended by Rocky Mountain Geotechnical, a culvert will be <br />' placed at a station on the access road at approximately station <br />7+50. This culvert is indicated on the Drainage and Sediment <br />Control Plan Map (f4ap S-1), previously submitted to the Division, <br />' and indicated as Culvert A. <br />The access road will be surfaced with gravel. <br />3. As described above, a culvert has been designed for placement at <br />section 7+50 as previously shown on the Drainage and Sediment <br />Control Plan t•1ap (Map S-1). <br />' Stipulation No. 11 <br />fJo response is necessary. ' <br />Stipulation flo. 12 <br />' The collection sites for the solid waste generated at the Bear No. 3 <br />operation are shown on the f4ine Facilities Map (hlap 10). Collection <br />sites will consist of large containers or barrels which can be easily <br />' transported from the mine site to the disposal area. Each container <br />will be properly maintained to allow no spillage or leakage of the <br />combustible material. Used oil will be stored in tanks near the shop <br />' area. These tanks will be maintained to contain used oil and prevent <br />contamination to adjacent areas. The facility will be regularly <br />pumped to provide adequate storage volume and preclude overtopping, <br />and will be sold to a local oil salvage dealer, or disposed of <br />' appropriately at the Delta County Landfill. <br />Stipulation No. 13 <br />' Bear Coal Company will provide the Division information regarding the <br />loadout facility which will be used by the Bear No. 3 Mine in the near <br />' future under separate cover. <br />Stipulation No. 15 <br /> The subsidence monitoring monument locations have been previously <br /> submitted to the Division in the original Bear No. 3 permit <br /> application and are indicated on the Geology/Hydrology htap (Map 6). <br />' There are seven (7) <br />mining. A typical monitoring <br />subsidence sites located over the area <br />monitoring monument detail of planned <br />is attached <br /> as Figure 6. <br />1 <br />A G ~ IJNG. <br />
The URL can be used to link to this page
Your browser does not support the video tag.