My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32315
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:56 PM
Creation date
11/23/2007 7:15:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
7/8/1982
Doc Name
CLARIFICATION OF BEAR 3 STIPULATION RESPONSE
From
ACZ INC
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Dan T. Plathews Page Four <br />July 8, 1982 <br />J The proposed sump location is shown on the attached Mine Plan Map (Flap <br />9). A detailed design drawing of the sump is also attached as Figure <br />5, Sump Design. The capacity of the proposed sump is approximately <br />17,165 gallons. <br />Because mining at the Bear No. 3 operation will advance primarily <br />updip, the sump will be located near the portal entries so that flow <br />of any groundwater within the mine can be channeled to the sump. Any <br />unmanageable groundwater encountered within the mine will be pumped, <br />1 channeled or otherwise diverted into the sump according to appropriate <br />operational procedures. If difficulties with groundwater control are <br />encountered, the Bear Coal Company will contact the Division for <br />~ assistance and/or concurrence with the procedures. <br />Stipulation No. 4 <br />Bear Coal Company will submit a detailed hydrologic report on any <br />water encountered within the underground mine. The first report will <br />be submitted in August of 1983, and annual reports will be submitted <br />yearly thereafter. <br />Stipulation No. 6 <br />Bear Coal Company will submit to the Division an annual hydrologic <br />report including data collected throughout the year. The first report <br />will be submitted Augusct, 1983? and will be submitted annually <br />thereafter. ~ <br />Stipulation No. 7 <br />' No response is necessary. <br />Stipulation No. 8 <br />Three monitoring points will be installed on the backfill at the Bear <br />' No. 2 portal area. These points will be monitored and the results <br />submitted to the Division. A detailed monitoring plan with <br />construction specifications will be submitted to .the Division prior to <br />backfilling of the P1ine No. 2 portal area. <br />Stipulation No. 9 <br />No response is necessary. <br />Stipulation No. 10 <br />' 1. As recommended by Rocky Mountain Geotechnical, a 15-foot wide <br />template (road-bearing surface) will be maintained between <br />stations 4+40 and 5+00 on the access road to the Mine No. 3 <br />portals. <br />A ~ ~ tt~c. <br />...........................o,..,., <br />
The URL can be used to link to this page
Your browser does not support the video tag.