My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32315
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:56 PM
Creation date
11/23/2007 7:15:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
7/8/1982
Doc Name
CLARIFICATION OF BEAR 3 STIPULATION RESPONSE
From
ACZ INC
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Dan Mathews <br />flay 27, 1982 <br />Page Three <br />The revised construction details for the sedimentation pond ar-e <br />shown on the Sedimentation Pond. Design flap (11ap S-3). The design <br />calculations for this pond are attached. <br />As shown on the Sedimentation Pond Design (htap S-3), several <br />baffles will be installed in the pond to channel flov~ and prevent <br />short-circuiting of the water directly from the inflow to the <br />outflow. These baffles will help extend the settling area of v,ater <br />found in the pond. This sedimentation pond is not designed <br />for a ]0-year 24-hour precipitation event as required under Rule <br />4.05.6(3)(a); however, because it will be used to complement the <br />overall drainage and sediment control measured, the Bear Coal <br />Company would like to have the entire system labeled as a treatment <br />facility under the requirements found in Rule 4.05.2 of the Coal <br />Regulations of the Colorado Mined Land Reclamation Board. The Bear <br />Coal Company is confident that the drainage and sediment control <br />plan submitted herein will be sufficient to meet the applicable <br />requirements found under Rule 4.05.2 and in the NPDES permit. <br />P.5 shown on the Sedimentation Pond Design t•tap (liap S-3), a sediment <br />storage level has been calculated for a one-year period. •4nnual <br />maintenance of the pond will be carried out in order to provide as <br />1 much sediment storage volume as practicable. Likewise, the <br />sediment storage level will be checked after every large <br />precipitation event and cleaning will be initiated if necessary. <br />1 The bottom of the sedimentation pond will be lined with a chemical <br />1 sealer that will not affect fish and wildlife in the area. This <br />sealer will be used to prevent gr-oundv~ater infiltration of ~:pater in <br />the sedimentation pond, or conversely, inflow into the pond by <br />groundwater. Following annual maintenance, the chemical will again <br />be spread on the bottom of tine sedimentation pond. The use of clay <br />as a pond liner is not acceptable because of difficulty in <br />maintaining this type of sealer following mair~tenar~ce. <br />In the event of a large precipitation event, the Bear Coal Company <br />will use a flocculant in the sedimentation pond in order to cause <br />any fine sediment in the pond to drop out prior to discharge. <br />A flocculant will be used only as a final effort to meet the <br />I effluent limitations and will not adversely affect fish, v~ildlife <br />and related environmental values in the tJorth Fork of the Gunnison <br />River or adjacent areas. <br />Stipulation No. 2 <br />Bear Coal Company believes that the chance of severe flooding in <br />the Bear No. 3 area will be minimized or eliminated by the <br />following two items: <br />~ ~9 <br />T•~~ <br />..._ ..............._•..........~ v <br />
The URL can be used to link to this page
Your browser does not support the video tag.