Laserfiche WebLink
,. ~ <br />• <br />5. The CONTRACTOR disturbed an additional area (150'X30') of <br />native vegetation located at the Southeast corner of the East Pit <br />which was not to be affected by his activities. The CONTRACTOR is <br />responsible for the revegetation of this site at no cost to the <br />OWNER. Revegetation shall include all of the same requirements <br />listed for the GEC/East Pit Coal Reclamation Project (RN-MINES- <br />322). <br />Please feel free to contact me if there are any questions. I look <br />forward to receiving your revised work schedule shortly. <br />Sincerely, <br />James B. McArdle <br />Senior Environmental Protection Specialist <br />