Laserfiche WebLink
- 3 - <br />• 2. The following are stipulated for surface water monitoring: <br />a) Flow measurements must be taken at surface water monitoring <br />site S[7-2 and water quality samples must be taken from sites <br />SW-2 and SW-5 on ticClane Canyon twice a year as follows: <br />i) Once during spring snowelt <br />ii) Once during a storm event <br />b) Flow measurements must be taken quarterly at Site SW-1 and <br />water quality samples oust be taken quarterly from sites SW-1 <br />and the new monitoring site on East Salt Creek (which must be <br />located on a map with a specific designation and must be ap- <br />proved by CMLRD and OS`i. <br />c) The water samples must be chemically analyzed for the parame- <br />ters specified below: <br /> Sodium Absorption <br />pH Ratio Iead (Pb) <br />Specific Conductance Bicarbonate[HC03) Sodium(NA+) Manganese (tin) <br />Temperature (field) Calcium(Ca+22) Sulfate(S04) Mercury(Hg) <br />Dissolved Oxygen (field) Alumiaum(Al) Molybdem~m(tio) <br /> Arsenic(As) Selenium(Se) <br />Total Suspended Solids <br />Total Dissolved Solids tlagnesivm('a+2) Boron(B) <br />Cadmium(Cd) Zinc(Zn) <br />Total Combustible Solids Copper(Cu) <br />Total Hardness Iroa(Fe) <br />d) The results of all monitoring must be submitted to the OSti and <br />CMLRD immediately after data collection. <br />3. The permittee must submit to the OSti and ChII.RD an annual report charac- <br />terizing the inflows, discharges and the consumption of water within the <br />mine. This report is to include a mine workings map showing the loca- <br />tions and quantity of inflows; a table keyed to the mine map which shall <br />contain the source (i.e. fault, fractures, etc.), quantity, duration,and <br />quality (i.e. pH, electro-conductivity and temperature) of all non-seep <br />inflows; a table containing records of water discharged from the mine, <br />_ _ consumed in the mine and imported for use within the mine; a discussion <br />of the water balance within the mine; and, a pro~ection.of hydrologic im- <br />pacts of mining in the upcpming year. <br />4. The permittee will continue monitoring wells GW-1 and GW-4 in East Salt <br />Creek alluvium quarterly. At these times the water level in the wells <br />will be measured and samples will be taken for analysis of pH, tempera- <br />ture and specific conductance. The results of this monitoring will be <br />submitted to the OSM and CMLRD irmediately after data collection and an- <br />alysis. <br />5. Within 5 months of permit issuance, the applicant must provide to the <br />C Regulatory Authority an analysts of the fill and any other disturbed <br /> <br />