Laserfiche WebLink
Permit Number CO-0026, ( ) <br />Page 5 of 7 <br />• Attachment 1 <br />Special Stipulations <br />1. Prior to the transport of any roof fall or other waste material produced <br />at the McClane Canyon Mine to the proposed Munger Canyon disposal site, <br />the Regulatory Authority must approve the proposed Munger Canyon site far <br />use as a waste disposal site. <br />2. The following are stipulated for surface water monitoring: <br />d) Flow measurements must be taken at surface water monitoring <br />site SW-2 and water quality samples must be taken from sites <br />SW-2 and SW-5 on McClane Canyon twice a year as follows: <br />i) Once during spring snowmelt <br />ii) Once during a storm event <br />b) Flaw measurements must be taken quarterly at Site SW-1 and <br />water quality samples must be taken quarterly from sites SW-1 <br />and the new monitoring site on East Salt Creek (which must be <br />located on a map with a specific designation and must be ap- <br />proved by the Regulatory Authority. <br />• c) The water samples must be chemically analyzed for the parame- <br />ters specified below: <br />Sodium Absorption <br />pH Ratio Lead (Pb) <br />Specific Conductance Bicarbonate~HCOg) Sodium(NA+) Manganese (Mn) <br />Temperature (field) Calcium(Ca+ ) Sulfate(S04) Mercury(Hg) <br />Dissolved Oxygen (field) Aluminum(A1) Molybdenum(Mo) <br />Arsenic(As) Selenium(Se) <br />Total Suspended Solids Magnesium(Mg+2) Boron(B) Zinc(Zn) 7/30 ~ <br />Total Dissolved Solids Cadmium(Cd) <br />Total Combustible Solids Copper(Cu) <br />Total Hardness Iron(Fe) <br />d) The results of all monitoring must be submitted to the <br />Regulatory Authority immediately after data collection Q~ a Mt~~,s/s. <br />3. The permittee must submit to the Regulatory Authority an annual report <br />characterizing the inflows, discharges and the consumption of water <br />within the mine. This report is to include a mine workings map showing <br />the locations and quantity of inflows; a table keyed to the mine map <br />which shall contain the source (i.e. fault, fractures, etc.), quantity, <br />duration,and quality (i.e. pH, electro-conductivity and temperature) of <br />all non-seep inflows; a table containing records of water discharged from <br />• the mine, consumed in the mine and imparted for use ~,aithin the mine; a <br />discussion ~f the Hatar balance ~.vithin the nine; and, a orojec_~on of <br />hydroioaic imnac~s of Tinina 'n -he uccomina year. <br />