Laserfiche WebLink
l 1 <br />•~ Li Chen • -2- • January 26, 1981 <br />fill materials and the determination of which materials would be most <br />appropriate for use in this particular pit. <br />4) Backfilling and final grading of the pit will be completed by <br />September 15, 1981. <br />5) Construction of an adequately sided/equiped sediment control <br />• system will be complete by November 15, 1981. <br />I <br />~ 6) Topsoiling and seeding will be complete for the pit area by <br />i November 15, 1981. <br />7) The Newlin Creek will be returned to the re-established channel <br />across the reclaimed area in 1985. The diversion ditch(s) will be backfilled <br />by July 31, 1985, the final grading completed by August 31, 1985; redistribu- <br />tions of topsoil completed by September 31, 1985; and seeding completed by <br />October 31, 1985. <br />The post-mining contour map was delivered to me at your office (inspection <br />~ trip) on January 10, 1981 and it was agreed that the details of the Newlin <br />Creek channel reconstruction and the diversion ditch modification will be <br />delivered by GEC to the Division no later than close of business or Thursday <br />i January 15, 1981. <br />The MLR Division appreciates your cooperative attitude and the good efforts <br />you have made to present a reclamation plan for the old Rex Carbon pit in a <br />j timely manner. ble are glad to assist GEC in this endeavor and I encourage <br />you 'to call me if you have futher questions. <br />Please let me know as soon as possible if my recollection and documentation <br />l of the results of our meeting differ significantly from yours. <br />Sincerely, <br />Peter H. Evans <br />Reclamation Specialist <br />PHE:mab <br /> - ~ ~ <br /> } 4 <br />f <br />