<br />The operation will result in slightly increased total dissolved <br />solids levels in the North Fork of the Gunnison River. The sources <br />are the discharge from the underground workings at the Sanborn <br />Creek facility, and drainage from waste piles located at the site. <br />The previously documented discharges from the Somerset Mine no <br />longer exist since mining and mine dewatering activities have <br />ceased and the old portals have been permanently sealed. Specific <br />anticipated water quality impacts are discussed within the <br />Cumulative Hydrologic Impact Study for the North Fork of the <br />Gunnison River. It has been found that the Somerset Mine <br />operation, including the Sanborn Creek addition, will not cause <br />significant salinity increase in the North Fork of the Gunnison <br />River . <br />The mine ~.aill not adversely impact flooding processes or <br />streamflows in the North Fork of the Gunnison River. Mining <br />operations are not expected to decrease flows in any of the <br />ephemeral or intermittent drainages to be undermined. The <br />operation will not adversely impact downstream water users. <br />The operator will use about 35,000 gallons per day for underground <br />and aboveground dust suppression. This water will be drawn from an <br />existing surface water right of 1.8 cfs, on the North Fork of the <br />Gunnison River. More detailed information is available in the CHIS <br />for the North Fork of the Gunnison River. <br />IV <br />Topsoil <br />The Division has determined that selected overburden materials ma_v <br />be used for, or as a supplement to, topsoil. The resulting soil <br />should be ?qual to or better than the available fill material. <br />This dot?rmination will be based on physical and chemical analyses <br />and field-site trials approved by the Division (4.06.2C4)(a)l. <br />Somerset Mining Company has agreed to remove and/or bury coal and <br />coals material on the pre-law Elk Creek yard area. Since topsoil <br />is not available, the resulting surface material will b? tested to <br />determine if it is suitable as plant growth medium. if it is not, <br />it will be covered by at least six inches of suitable plant growth <br />medium or topsoil salvaged from development of the present c~~a1 <br />mine waste pile area or the Sanborn Creek facilities areas. The <br />areas stripped of topsoil for emplacement of the Sandorn Creek <br />facilities ~.vill be regraded following mining, tested and treated <br />with topsoil in a Similar fashion. All stockpiled topsoil will be <br />used in reclamation. None will be left stockpiled upon final <br />reclamation. The topsoil stockpiled at the upper Hubbard Creek <br />area will be used to partially cover pre-la•,a waste piles chat exist <br />at the lower Hubbard Creek area. The upper Hubbard Creek bench <br />will be retained as an approved USFS parking lot. <br />V <br />Sealing of Dri'1ed Holes and Underground Oeenings <br />The Division will require that ?ach hole, well or othe- undergrounc <br />op?Wing b? capped, sealed, backfilled, cr otherwise prop?riy <br />managed (4.07.3>. <br />-lb- <br />