My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32029
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:49 PM
Creation date
11/23/2007 7:10:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
9/25/1992
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR PR2
From
Sanborn East Tract Addition
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />flooded workings of the Oliver Mine, the Sanborn Creek Mine <br />has committed to limited extraction under those areas known <br />to be flooded. This would avoid catastrophic inundation. <br />The mine has supplied the Division with a geotechnical <br />analysis of the mine plan, demonstrating that it would avoid <br />subsidence-caused fracturing of the interburden. <br />4. The abandoned Hawk's Nest Mine has several drill holes that <br />were drilled down from the active mine into lower seams. <br />These holes are not believed to be sealed and could provide a <br />conduit through which water could flow into the active mine; <br />however, as reported in the PHC, there is no indication that <br />the mine is flooded. <br />Mine inflow, except that used in the mining process, will be <br />treated and discharged to the North Fork. The discharge will meet <br />NPDES standards, but it is expected that the discharge will have an <br />ele~rated TDS for which there are no discharge standards. From <br />water quality analyses of the flooded old Somerset Mine, TDS values <br />of 3,200 mg/1 for the discharge can be expected. <br />Post-mining impacts are expected to be small. The mine is expected <br />to slowly flood to the level of the river, which is below the <br />elevation of the portal. Discharge from the portal is unlikely. <br />The water quality of the flooded workings is anticipated to be the <br />same as that of the old Somerset Mine. After mine closure, the <br />proposed Sanborn Creek area is not expected to contribute <br />additional dissolved solids to the river. <br />Effects cn Surface Water <br />The ar?as or surface disturbance at the Somerset Mine are protected <br />by sediment control S`/Stems including diversion and containment <br />d itches, sediment ponds, and other alternate sediment control <br />features such as rock, vegetation and straw filters. .411 point <br />source discharges are regulated ur~der the National Pollution <br />Discharge Elimination System (NPDES). Specific details regarding <br />the sediment and drainage control systems are found in the Somerset <br />Mine Permit, volume 1, pages 2.05-15, 2.05-16, and 2.05-41 through <br />2.05-48. Maps E8-3255, 3276, 3277, 3278, and 3279 also contain <br />pertinent information. Drainage and sediment control informat`on <br />specific to the Sanborn Creek Permit Revision area is located in <br />the Permit Revision No. 1 binder, pages 2.05-15, 2.05-16; 2.05-~13 <br />through 48, and Appendix B. Drawings 5-002, 003 and 004 also <br />Contain pertinent information. <br />Drainage from disturbed areas can contribute additional suspended <br />solids to offsite stream systems; however, the aoove-referenced <br />sediment control systems gill effectively control sediment yield to <br />offsite ar?as. Other aooiicable effluent limitations will also be <br />met, as required by the NFDES permit. T'ner? is no evidence of <br />acid-forming er toxic-producing materials. <br />_15_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.