My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32029
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:49 PM
Creation date
11/23/2007 7:10:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
9/25/1992
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR PR2
From
Sanborn East Tract Addition
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i r <br />16. The Division has contacted the Office of Surface Mining, Reclamation Fees <br />Branch. As of this time the operator is current in the payment of <br />reclamation fees required by 30 CFR Chapter VII, subchapter R <br />(2.07.6(2)(0)). <br />SECTION B <br />The following findings and specific approvals are required by Rule 4: <br />I. Roads - Rule 4.03 <br />A. Haul Roads <br />1. The Division has approved the retention of the haul road <br />leading to the town of Somerset's cemetery and water supply <br />since it is compatible with the approved post-mining land <br />use, and a request for its retention was submitted by the <br />landowner (4.03.1(1))f)(i)). <br />2. The Division has approved the location of a portion of the <br />haul road in the channel of an intermittent stream (Sanborn <br />Creek) as depicted on Map No. 5-016, 019, and 021 <br />(4.03.1(2)(h)>. <br />8. Access Roads <br />The Division has approved the location of a portion of the <br />access road to the lower Hubbard Creek facilities in the <br />channel of a perennial stream as depicted on Map No. 17, <br />Section 2.05 of the permit application (4.03.2(2)(b)). This <br />road was constructed prior to 1977, and the culvert and <br />associated fill across Hubbard Creek will be remov?d upon <br />cessation of mining (see S?ction Z.OB, Mzp CB-11228). <br />II. Support Facilities - Rule 4.04 <br />A. Construction of support facilities for the Sanborn Creek Mine <br />resulted in the relocation of a section or railroad track adjacent <br />to the permit area. Upon receipt of written approval from the <br />railroad owner, the Division approved this activity. <br />B. No additional support facilities are required for the Sanborn East <br />Tract. (4.04(6)). <br />III. Hydrologic Balance - Rul? 4.05 <br />A. Water Quality Standards and Effluent Limitations <br />The Civisicn r,a5 approved ;mall area e~cempt'ons from use of <br />sediment ponds due to the " mited size of certain areas and <br />due to the fact that pones end treatment facilities arz not <br />necessary for the drainage 'rem these areas to meet the <br />effluent limitations of Rul? 4.05.2 and applicable State and <br />federal water quality standards for- receiving streams, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.