My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31893
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31893
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:45 PM
Creation date
11/23/2007 7:08:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
General Documents
Doc Date
10/23/1985
Doc Name
DRAFT STIPULATION 12 (Stip 9)
From
MLRD
To
PEABODY COAL CO
Permit Index Doc Type
Stipulation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />SECTION lC{7I <br />STIPULATION 12 OF DRAFT <br />SENECA II-W PINDINGS DOCOMENT <br />An oil well is located within 500 feet of the proposed <br />blasting operation. The concern is damage to the well <br />casing and ignition of vented gas. <br />Peabody Coal Company intends to follow all safety precautions <br />to protect damage to the oil well. When within 500 feet <br />of the well, Peabody intends to follow the scale distance <br />formula W = (fi0)2to limit vibrations to the well. When <br />necessary, the vibration limits will be monitored with <br />a seismograph machine and blasting procedures will be altered <br />if vibration is excessive. Spacings and amount of stemming <br />will be adjusted when in this area to avoid vibration and <br />flyrock. Peabody Coal Company will contact the owner of <br />the well to see what limits of vibration the casings will <br />withstand. <br />To insure vented gas is not ignited from blasting, Peabody <br />Coal Company will change the type of explosive used on <br />the surface when in this area. Peabody will use a <br />non-electric trunk line delay system (Nonel) to tie in <br />shot on the surface. This is a non-exploding tube which <br />does not emit any sparks or source of ignition with the <br />exception of the detonator part, which will be covered <br />with earth before shot is fired. All detonating cord in <br />excess needed to tie in Nonel protruding from the blast <br />hole will be cut off. The remaining will be covered with <br />earth. No explosive material will be exposed. <br />WRP/jac <br />8/06/85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.