My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31745
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:42 PM
Creation date
11/23/2007 7:04:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983058
IBM Index Class Name
General Documents
Doc Date
11/1/1983
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-33- <br />Facilities included in the mine plan are as follows: <br />A. A combination office, shop, and dry facility. Also, possibly a small <br />office trailer, shop and dry trailer. <br />B. An electrical substation. <br />C. Two stacking conveyors (36" x 100'}. <br />D. One rigid frame conveyor. <br />E. One conveyor feed station. <br />F. Truck loading bins. <br />G. Sizing facility (future). <br />H. Truck sca]e (future). <br />I. Water tank and system. <br />The underground development waste pile and the mine access road are discussed <br />in the following sections of this document. <br />The applicant is in compliance with the requirements of this section, <br />XV. Coal Processing Waste and Non-Coal Processing Waste -Rules <br />~ n c~a1 n i n , ., a n t i <br />No coal processing will be conducted at the Twin Pines No. 2 mine site. <br />Therefore, no coal processing waste or non-coal processing waste will be <br />disposed of at the mine site. (See page 86 of the permit application.) <br />Underground development waste will be disposed of in a waste pile near the <br />northern terminus of the previously disturbed surface facilities area. Waste <br />will be placed in maximum 4 foot thick lifts and compacted by normal equipment <br />traffic. Underdrains constructed of perforated the in a gravel drain will oe <br />installed to assure prevention of moisture invasion from beneath the pile. <br />The completed waste pile will be graded to a final facial slope of 2:1 <br />(horizontal to vertical), with a maximum capacity of 8,900 cubic yards. <br />Underground development waste will be backstowed within the underground <br />workings whenever possible. <br />The application is in compliance with the requirements of this section. <br />XVI. Roads - Rules 2.05.3(3) and 4.03 <br />A discussion of road designs is contained in Volume 1, Section 2.05, pages 72 <br />and 73 and in Volume 2, Mine Site Plan Map. Several mine profiles, which show <br />road Locations, are also found at the end of Volume 2 of the mine application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.