Laserfiche WebLink
<br />• • • iii iiiiiiiiiiiiiiii <br />~/~` Cripple Creek & Victor Gold Mining Company 999 <br />l1 ~ A Joint Venture -Pikes Peek Mining Company, Manager <br />`~/ ~L~/ Operations Office Englewood Office <br />PO. Box 191, 2755 State Highway 67 5251 DTC Parkway, Suite 700, Englewood <br />Victor, Colorado 80860 Colorado 80111 <br />(719) 689-2977 • FAX (719) 689-3254 (303) 889-0700 • FAX (303) 889-0707 <br />July 12, 1994 <br />SENT BY FACSIMILE -COPY FOLLOWS BY MAIL <br />Mr. Berhan Keffelew <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Mines and Geology <br />Off ice of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />~;IyR_ ~ <br />~~~• - /U~ I419~4 <br />S 0p 0~ ~i'~~~E/di~ 6 `~(,coY <br />Reference: Cresson Project: Permit Number M-80-244: Valley Leach Underdrain <br />Configuration. <br />Dear Mr. Keffelew: <br />In accordance with our discussion of late this afternoon, we are submitting to you the <br />proposed change in a segment of the underdrain configuration. This change will maintain the <br />flow capacity of the underdrain and improve the construction technique. The revised cross <br />section is submitted as Attachment 1 to this request. <br />This change in configuration will only occur upgradient of the area where the total width of <br />the underdrain is to be 20 feet or less. In the remainder of the area where the total width <br />increases from 20 up [0 100 feet, the original configuration will remain. <br />The original configuration is one of the entire underdrain excavated to a single grade with the <br />pipes located in the middle of the excavation and the pipe bedding material piled around and <br />over the pipes. Then the larger underdrain material will be placed on top of the bedding <br />material as well as beside the bedding material and across the entire design width of the drain <br />area (up to 100 feet). In the areas narrower than 20 feet, with the proposed change, it will <br />be much more efficient to excavate a trench for the pipes, lay the pipes in bedding material, <br />and then fill that trench with bedding material. Then the bench area above the trench will be <br />filled to the design cross-section with the larger underdrain rock -which covers the beddng <br />rock in the lower trench. <br />