Laserfiche WebLink
4.05.2 and applicable State and Federal water quality standards for <br />receiving streams (4.05.2(3)(b)(ii)). <br />B. Diversions and Conveyance of Overland Flow <br />The Division does not propose to approve a pem2anent diversion <br />(4.05.3(2)). <br />2. The Division approved construction of a diversion on an existing landslide <br />(4.05.3(4)). <br />C. Stream Channel Diversions <br />The Division does not propose to approve the diversion of an ephemeral <br />stream draining at least one (1) square mile, an intermittent or a perennial <br />stream (4.05.4(1) and (4)). <br />2. Channel lining structures, retention basins, and artificial channel <br />roughness structures are proposed for use to control erosion. These means <br />were approved by the Division, since they aze necessary to control <br />erosion, they are stable and will require infrequent maintenance <br />(4.05.4(2)(a)). <br />D. Sediment Ponds <br />The Division approved alternative design criteria or specifications for use <br />in sediment pond design and/or construction. The gob pile pond (Pond D) <br />has an embankment with slopes steeper than typical requirements. Bowie <br />Resources, Limited provided the required geotechnical stability analyses <br />to justify the implementation of steeper embanlanent slopes. Sediment <br />pond design details aze presented in Section 2.05 and Volume III, Exhibit <br />8 of the permit application document (4.05.6(11)). <br />E. Acid-forming and Tozic-forming Spoil <br />Based upon information provided by BRL, the Division does not <br />anticipate that any acid-forming or toxic-forming spoil will be <br />encountered during the operation of the Bowie No. 2 Mine (4.05.8(3)). <br />F. Impoundments <br />The applicant has not proposed the use of alternative design criteria and <br />specifications for impoundment design and construction (4.05.9). <br />28 <br />