My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31521
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:37 PM
Creation date
11/23/2007 7:01:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
General Documents
Doc Date
4/18/1983
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />-2- <br />PROPOSED DECISION <br />Foidel Creek Mine <br />The Colorado ~~lined Land Reclamation Division proposes to approve with <br />stipulations an application for a permit revision to conduct underground <br />coal mining submitted by The applicant for the Foidel Creek Mine. <br />This approval decision is based on a finding that the proposed operation <br />will comply with all requirements of the Colorado Surface Coal Mining <br />Reclamation Act, C.R.S. 1973, as amended, 34-33-1U1 et sew., and the <br />Regulations promulgated pursuant to the Act. <br />The permit application and the stipulations will become a binding part of <br />the permit upon approval. The stipulations for the Foidel Creek Mine are <br />as follows: <br />Sti ulation No. 1 <br />T V R Y TH APPLICANT'S PREDICTIONS OF STREAM DEPLETIONS IN THE <br />AREA OF THE 'WADGE COAL-OVERBURDEN AQUIFER DISCHARGE AREA ON FISH <br />CREEK, THE APPLICANT SHALL INSTALL AND MONITOR A SET OF NESTED <br />PIEZUMETERS COMPLETED IN THE ALLUVIUM OF FISH CREEK OVERLYING THE <br />SUBCROP OF THE WADGE COAL-OVERBURDEN AQUIFER. A PLAN SHALL BE <br />SUBMITTED WITHIN 30 DAYS AND THE WELLS SHALL BE INSTALLED WITHIN 120 <br />DAYS OF ISSUANCE OF THIS PERMIT. THE WELLS SHALL BE MONITORED <br />MONTHLY FOR WATER LEVELS AND THE RESULTS OF MONITORING SUBMITTED <br />QUARTERLY TO THE DIVISION. <br />Stipulation No. 2 <br />WITHIN 30 DAYS OF THE PERMIT ISSUANCE, THE APPLICANT SHALL SUBMIT TO <br />THE DIVISION FOR REVIEW A PLAN TO DISCONTINUE THE DISCHARGE OF ANY <br />WATER FROM THE SPOILS AQUIFER TO THE SURFACE WATER/ALLUVIAL AQUIFER <br />SYSTEM. THE PLAN SHALL BE PUT INTO EFFECT WITHIN 45 DAYS OF APPROVAL <br />BY THE DIVISION. <br />Stipulation No. 3 <br />THE APPLICANT SHALL INCLUDE, AS PART OF THE QUARTERLY HYDROLOGIC <br />MONITORING SUBMITTAL, THE RESULTS OF ALL HYDROLOGIC MONITORING <br />REQUIRED BY THE COLORADO DEPARTMENT OF HEALTH. <br />Stipulation No. 4 <br />WITHIN 60 DAYS OF PERMIT APPROVAL, THE APPLICANT SHALL SUBMIT A PLAN <br />FOR MONITORING THE DISCHARGE OF WATER FROM THE UNDERGROUND WORKINGS. <br />THE MONITORING PLAW SHALL INCLUDE CONTINUOUS FLOW MONITORING, MONTHLY <br />SAMPLING OF FIELD PARAMETERS, ANO QUARTERLY SAMPLING OF FULL SUITE <br />WATER QUALITY. THE APPROVED i~IUNITORING PLAN SHALL GO INTO EFFECT AS <br />SOON AS WATER IS DISCHARGED FROM THE UNDERGROUND WORKINGS, AND THE <br />MONITURING RESULTS SHALL BE INCLUDED IN THE OPERATOR'S QUARTERLY <br />HYDROLUGIC REPORTS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.