My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31411
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:34 PM
Creation date
11/23/2007 7:00:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
8/4/1994
Doc Name
INVITATION FOR BID
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6Z Measurement and Payment <br />Payment for this task will be reflected under Item six (6) of the Bid Schedule as an hourly <br />rate for a CAT D-7H or 215 FHP machine with operator. Bid hourly rates shall reflect the <br />CONTRACTORS estimate for equipment and personnel costs per hour to complete the <br />task. Measurements will be actual hours required to complete work outlined above and/or <br />as directed and approved by the PROJECT MANAGER. The hours outlined under Item <br />6 are NOT guaranteed. <br />PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor construction <br />activities and ensure that each work item is completed and wnstruMed to design <br />specifications. The PROJECT MANAGER will be available during regular business hours <br />(8:00 A.M. to 5:00 P.M.) on weekdays. Inspections will not be scheduled on weekend days <br />or holidays without prior approval of the PROJECT MANAGER. The following items must <br />be observed and approved by the PROJECT MANAGER before proceeding with additional <br />work: <br />1. Final contours of graded coal material prior to topsoil placement. <br />2. Depth of topsoil on coal material prior to revegetation. <br />3. Successful plug placement on the methane gas wells prior to backfilling and <br />revegetation. <br />4. Final grade and dimensions of ditch prior to geo fabric installation. <br />c:\hawk\bid2 <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.