My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31364
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31364
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:33 PM
Creation date
11/23/2007 6:59:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
General Documents
Doc Date
7/26/1991
Doc Name
COAL RIDGE 1 MINE C-84-065 RESPONSE TO STIPULATIONS 18 & 20
From
MLRD
To
NCIG FINANCIAL INC
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 6 <br />THE DIVISION REQUIRES THAT STORM KING MIrlIr1G COMPLETE AN APPROVABLE <br />"DETAILED ENGINEERING PLAN" FOR THE PERMArENT PHASE B WASTE SLURRY <br />EMBANKMENT AND SUBMIT THE PLAN TO THE DIVISION ONE YEAR PRIOR TO THE <br />EXPIRATION DATE OF THIS PERMIT. THE DETAILED PLAN SHALL BE SUBMITTED <br />AS A PERMIT REVISION. FURTHER, IF 12,000 TONS OF WASTE IS PRODUCED <br />PRIOR TO OBTAINING APPROVAL OF THE PERMANENT WASTE EMBANKMENT, MINING <br />OPERATIONS SHALL CEASE UNTIL AN APPROVAL IS OBTAINED FOR PERMANENT <br />DISPOSAL OF ADDITIONAL WASTE. <br />Stipulation No. 7 <br />PRIOR TO CONSTRUCTION OF THE ACCESS ROAD, THE APPLICANT MUST SUBMIT <br />SITE SPECIFIC DESIGN STANDARDS FOR Er48ANKMENT STABILITY, FOR DIVISION <br />APPROVAL. THE ANALYSIS SHALL BE CONDUCTED IN CONFORMANC'c WITH RULE <br />4.03.1(3)(d)(vii). THE DESIGN STANDARDS SHALL BE SUBMITTED AS A <br />REVISION TO THE PERMIT APPLICATION. <br />Stipulation No. 8 <br />THE DIVISIOr1 REQUIRES THE PERMITTEE IN THE EVENT THAT SINKHOLE <br />I~ SUBSIDENCE CGLLAPSE b1ERE DETERMINED, BY THE DIVISION, TO CONSTITUTE <br />v~, POTENTIAL HAZARD TO THE PUBLIC HEALTH ArID SAFETY, TO I~iPLEMENT <br />APPROPRIATE SEALING AND BACKFiLLING OF SINKHOLE COLLAPSE FEATURES. <br />Stipulation No. 9 <br />THE DIUISIOrJ REQUIRES THE PERMITTEE IN THE EVENT THAT ANY SLOPE <br />INSTABILITY IS DETERMINED BY THE DIVISION TO HAVE CEVELOPED WITHIN <br />THE AFFECTED AREA, TO SUBMIT TO THE DIVISION FOR REVIEW AN ANALYSIS <br />~ OF THE CAUSES AND RESULTANT HAZARDS OF ANY SUCH UNSTABLE SLOPE AREA. <br />~~ USING THIS ANALYSIS, THE DIVISION SHALL DECIDE WHETHER A HAZARD IS <br />~~~~~ REPRESENTED BY ANY SPECIFIC SLOPE r10VEMENT EVENT AND WHETHER A SLOPE <br />STABILIZATION PROGRAM SHOULD BE DEVELOPED AND IMPLEMENTED. <br />. h <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.