Laserfiche WebLink
<br />w <br />disposed of, even by processing it in the batch plant. <br />NOV would not allow for this. <br />The options and action dates for the permittee to <br />outlined: removal of all off-permit disturbance and re <br />or convert the permit to a "112" by adding more land t <br />all current disturbance. It was noted that this does <br />any specific action to be taken on BLM land. BLM has <br />that operations now on their land are trespassing, will <br />and there will be no operations there in the future. <br />with that, the NOV was worded to deal only with private <br />Hollenbeck's. <br />Access to the pit on the hilltop will be difficult wi <br />the road and switchback located on BLM land. The elec <br />to the site is accessed via the lines coming off a p <br />just within the BLM property line. These specific str <br />be allowed by BLM to remain onsite, and used by the o <br />they can be specified in the MLRB permit language to <br />for other purposes, change location, expand in area <br />approve them will require some delay in the BLM revi <br />probably beyond the NOV deadline date. If these items <br />remain on BLM property, they too will have to be remo <br />land reclaimed. At present however, because they are <br />without their approval, they are in violation of their <br />Normally a <br />noose were <br />Maim only, <br />~ encompass <br />got mention <br />determined <br />be removed, <br />Co dovetail <br />land, ie., <br />hout using <br />ric supply <br />le located <br />ctures may <br />erator, if <br />of be used <br />etc. To <br />w process, <br />are not to <br />ed and the <br />n BLM land <br />permit. <br />It was mentioned that a property line fence will be built, <br />including any necessary configuration for the road a d electric <br />r.o.w. This will be to mark and protect the boundary rom future <br />encroachment. <br />The stormwater runoff issue was discussed. This operat on lies at <br />the bottom of a 150-acre watershed. Though little runo f normally <br />reaches the bottom, due to permeability of the soils, there is <br />potential for uncontrolled runoff in a severe event. P acement of <br />structures upstream of the permit area, ie., on BLM la d, will be <br />explored. <br />A copy of the present permit's reclamation plan was given to BLM <br />staff. <br />In summary, the permittee and operator were urged to c mplete the <br />cleanup plan and submit it to CDOH for approval. Onc approved, <br />the site will be cleaned up, all BLM property will be v Gated, and <br />the permit will be brought into compliance, either by relocating <br />all of the operations onto the present permit area orb enlarging <br />the permit area to include all disturbance. All off-permit <br />disturbance will be reclaimed. There are deadline date for these <br />actions, and activities must be completed in a timely anner. <br />All parties agreed to stay in communication with ~he others <br />regarding any changes in the status of the problems di cussed. <br />b:\dmgcorr10.94/1-2 <br />