Laserfiche WebLink
-6- <br />Minor Revision 12 - Approved August 30, 1984. <br />Re ocation o Subsoil Stockpile K to the site of Stockpile H. Approved <br />delay of movement of Topsoil Stockpile C for 90 days. <br />Minor Revision 13 - Approved September 4, 1984. <br />De ays unti 1985 the reclamation of the Barren Ridge Area. This delay is <br />applicable to 11.2 acres of Barren Ridge, and 4.3 acres of Federal lease <br />No. 1 area. <br />Minor Revision 14 - Approved September 5, 1984, <br />Re ocation o Surface Water Monitoring Site S-2. It also approved the <br />relocation of Pond 004. The pond could not be relocated until Diversion <br />Ditch 1F2 has been approved and constructed. <br />Minor Revision 15 - Approved October 5, 1984. <br />ove t e o ice trailer approximately 50 feet, and to erect a portable <br />maintenance shelter on site. <br />Minor Revision 16 - Approved October 2, 1984. <br />Dri an a uvial well for dust control purposes. The following <br />requirements were imposed upon the company: <br />1. Chimney Rock Coal may not drill the well until they receive approval <br />from the Colorado Division of Water Resources. (Received <br />September 17, 1984). This stipulation was complied with. <br />2. No waste water from the dust suppression activities is to be <br />discharged into the AVF ground water system or into Stollsteimer <br />Creek. This stipulation is ongoing. <br />3. It is the Division's understanding that the well will be left after <br />Chimney Rock Coal is done mining, to be used by Mel Martinez. The <br />company should be aware that the well permit as applied for is for <br />commercial use and is not applicable to Mr. Martinez's use without a <br />transfer or modification. This stipulation will apply in the future. <br />Technical Revisions <br />Technical Revision Ol - Withdrawn. <br />ropose auger mining the A, B and C coal seams in the East Pit to within <br />80 feet of Highway 151 centerline. This revision was subsequently <br />withdrawn. <br />Technical Revision 02 - Approved July 7, 1983. <br />Auger Mine t e A, B, and C coal seams in the East Pit area, near State <br />Highway 151, Stipulations: <br />