Laserfiche WebLink
-5- <br />The drainage ditch around the west side of the storage area shall not <br />intercept or interfere with the diverted drainageway which passes <br />along the west side of the permit area. This stipulation is ongoing. <br />3. The maps shall be inserted in the permit document as requested. This <br />stipulation is delinquent. <br />A copy of the map with an original signature must be provided. This <br />stipulation is delinquent <br />Minor Revision 07 - Approved October 13, 1983. <br />Remova o 00 cubic yards of subsoil from a stockpile in the Barren <br />Ridge Area, and placement on the Period 5 Reclamation Area (Map 178, <br />revised October 5, 1983), with a stipulation: <br />This permit modification shall not be considered as approved until the <br />minor modification information has been placed in the permit application. <br />This placement is the responsibility of Chimney Rock Coal Company. This <br />stipulation is delinquent. <br />Minor Revision 08 - Approved October 13, 1983. <br />U DA, Sol Conservation Service (SCS), to plant a 1/4 acre revegetation <br />test plot on the east slope of the original East Pit reclamation. <br />Minor Revision 09 - Denied April 16, 1964. <br />This revision would have provided fora temporary topsoil stockpile in the <br />Barren Ridge Area. A thorough review and reevaluation of the topsoiling <br />plan for the Revision 1 Area was recommended. <br />Minor Revision 10 - Approved April 17, 1984. <br />Auger mim ng of A and B Seam Coal in the East Pit. <br />Minor Revision 11 - Approved June 13, 1984. <br />Temporary y alter the Barren Ridge drainage system. The west diversion <br />ditch was routed into the Barren Ridge Pit. Two stipulations: <br />Stipulation No. 1 - Perma Resources provides the Division with a statement <br />of the time frame the temporary diversion will be needed, and a <br />demonstration that the Barren Ridge Pit is capable of containing the <br />24-hour, 10-year storm event for the area which the proposed diversion <br />will drain. This stipulation has been complied with. <br />Stipulation No. 2 - Since the Barren Ridge Pit is currently being filled, <br />Perma Resources must demonstrate that a large enough area will be Teft in <br />the Barren Ridge Pit to contain a 24-hour, 10-year storm event until the <br />proposed expanded Pond 004 is constructed. This stipulation has been <br />complied with. <br />