Laserfiche WebLink
<br /> <br />2. Channel lining structures, retention basins, and artificial channel rough- <br />ness structures are proposed for use to control erosion. These means <br />are proposed to be approved by the Division since they are necessary <br />to control erosion, they are stable, and will require infrequent main- <br />tenance (4.05.4(21(all. <br />3. The Division has approved a permanent diversion of a portion of the <br />Ciruela Canyon. This diversion is consistent with applicable State law, <br />will not diminish downstream water rights, and meets the <br />requirements of Rule 4.05.4 (4.05.4(41)• <br />C. Surface and Groundwater Monitoring <br />1 . The applicant will conduct monitoring of groundwater in a manner <br />approved by the Division. The groundwater monitoring plan is shown <br />in Tables 22 and 23 on pages 2.05-35 and 2.05-36 of the permit <br />application (4.05.1311)). <br />2. The applicant will conduct monitoring of surface water in a manner <br />approved by the Division. The monitoring plan was submitted under <br />2.05.6(311b)(iv) and is shown in Tables 22 and 23 on pages 2.05-35 <br />and 2.05-36 of the permit application (4.05.13(211. <br />III. Topsoil <br />A. The Division has done an initial review of the permittee's soil plan. Further analysis <br />is needed, so Stipulation No. 71 is required. <br />Stipulation No. 71 <br />THE PERMITTEE WILL SUBMIT TO THE DIVISION BY APRIL 21, 1994 A <br />COMPREHENSIVE TECHNICAL REVISION WHICH ADEQUATELY <br />ADDRESSES: <br />1. APPROPRIATE TOPSOIL REPLACEMENT REQUIREMENTS AND AN <br />ADEQUATE TOPSOIL MASS BALANCE ANALYSIS;. <br />2. MORE APPROPRIATE REVEGETATION SUCCESS STANDARDS, <br />BETTER DEFINED VEGETATION SAMPLING METHODOLOGY, <br />AND MORE APPROPRIATE REVEGETATION SEED MIXES. <br />IV. Sealing of Drilled Holes and Underoround Oeeninos <br />A. The Division will require that each hole, well, or other underground opening be <br />copped, sealed, backfilled, or otherwise properly managed (4.07.31. <br />V. Coal Mine Waste Banks <br />A. The Division has approved plans for use, construction, and maintenance of a <br />coal mine waste disposal area (4.10.1(1)). <br />12 <br />