Laserfiche WebLink
PHASE Ie - This phase is an area of current excavation activity. <br />• To the north this will be a;:panded to about 75 to 100 feet from the <br />ditch sides. To the south it will expand through the narrow neck and <br />then expand to the east. The latter area may not be mined, but a plan <br />is presented just in case it is. The area along Academy will be lowered <br />to an elevation of about 12 to IS feet above the roadway, but in mast <br />areas the presence of the powerline will determine the depth of <br />operation. In no case will the mining extend below the level of the <br />base of the powerpoles. <br />PHASE IIe - This BI acre area will be mined very much in <br />accordance with the method described above, that is, two or three areas <br />will be opened at a time and these worked into a merging pit. In this <br />area no real direction of mining can be described as it will tend to <br />move about. However, projections indicate that at the most about 30 to <br />40 acres will be opened at a time. This is all that is needed. As <br />areas are completed they will be topsoiled thus maintaining this maximum <br />~ exposed acreage value. <br />PHASE IIIe - It has still not been determined whether this area <br />will be mined, but a plan is presented for it just in case it is. If it <br />is mined, the direction of mining will be generally eastward from the <br />boundary of Phase IIe and IIIe. <br /> <br />a - ~ D~ <br />F'AGE B OF it - EXHIEIT D <br />