Laserfiche WebLink
Requirement 2. <br />Rocky Mountain Geotechnical, Inc. previously submitted a plan <br />to Blue Ribbon Coal Company for haul road reclamation. It is <br />general and based on one cross-section. Based on the geotechnical <br />evaluation done for the haul road, filling of the haul road cut is <br />not a stability concern. A haul road reclamation cross-section <br />location is provided in plan view on the attached figure, Plan <br />Reclamation Contour, and is designated A' - A'. The related cross- <br />section A' - A' is also provided. This cross-section would be <br />typical to indicate the design plan associated with reclaiming the <br />portion of the haul road where cut slopes exist. Additional <br />reclamation cross-sections can be provided if MLR requires them. <br /> <br />