My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31086
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:28 PM
Creation date
11/23/2007 6:52:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
12/15/1983
Doc Name
STIPULATIONS 7 AND 23 PN CO-044-81
From
EMPIRE ENERGY CORP
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• to keep off of the berm. <br />The existing road will be used to gain access to the lower bench. <br />The entire length of the access road is located on a gentle slope. <br />Refer to Map IV-15 for location. No cuts or fills are required for the <br />road. The overall grade of the road is 74h:1v for the position of the <br />road that runs in a general east to west direction, and 23h:1v for the <br />portion of the road that runs in a general north to south direction. <br />The horizontal alignment is consistent with the surrounding <br />topography. The road will be surfaced with a durable rock material to <br />decrease the potential for erosion; however, given the grade of the <br />• road, no erosion problems should be encountered. No culverts are <br />required for the access road. The roads will be maintained on a <br />periodic basis to ensure the road surface material is in place and to <br />check for any erosion problems. <br />The crusher will set on a pad above the screening plant. The pad <br />will be constructed of wooden support beams and fill, The pad will be <br />five feet in height, approximately 15 feet in width at the top of the <br />pad, and 30 feet in length at the top of the pad. This will require <br />approximately 83 yd3 of fill. The side slopes, when present, will be <br />2h:ly or steeper and will require approximately 42 yd3 of fill. The <br />total fill for the pad will be approximately 125 yd3. This material <br />will be obtained from the lower bench or imported to the site. <br />• The crusher and screening plant is a factory built mobile unit that <br />I V-44 e <br />(RcV. 12/13/83) <br />
The URL can be used to link to this page
Your browser does not support the video tag.