Laserfiche WebLink
<br /> <br />11. PROJECT OBSERVATION. The following items must be observed and approved by the <br />PROJECT MANAGER before proceeding with additional work: <br />Placement and covering of all culverts. <br />All final grading before the commencement of revegetation. <br />Grading of spillways and crossings prior to riprap placement. <br />Erosion repair prior to erosion mat installation. <br />Broadcast seeding and tubling planting. <br />12. A list of attenders is attached for your information. <br />13. A sample "AML Contractor Ownership and Control Information Package" is also included. <br />There is no need to return this form with your bid. The successful bidder will be required <br />to submit this form to DMG. <br />14. A Bids information package is attached far your information on future bids. <br />15. Receipt and acceptance of this amendment shall be acknowledged on the bid form. <br />16. All terms and conditions of the Bid other than as changed by this amendment remain the <br />same. <br />17. Map Number 7, showing ponds affected by this reclamation work is included as part of <br />this Amendment 1 . <br />m:\inp\chersA\tbm <br />5 <br />