My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30983
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:23 PM
Creation date
11/23/2007 6:51:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
General Documents
Doc Date
3/23/1995
Doc Name
AMENDMENT 1 TO MVC-MINES-348
From
DMG
To
ALL BIDDERS ON THE TRINIDAD BASIN MINING PROJECT
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Riprap material must consist of durable irregular rock having a minimum D-50 of 6 inches <br />and a D-Max of 18 inches installed in accordance with drawing number 3. <br />The riprap shall extend 10 feet down the outslope of the spillway. <br />The Project Manager will authorize the use of large non-specification riprap boulders <br />currently existing on this spillway for placement on the outslope area of the spillway to <br />augment the specification rock at this location. <br />9. TASK 13-REVEGETATION. The Work Description is changed and clarified to include the <br />following: <br />As clarification, all areas affected by tasks 1 through 12 will be reseeded in accordance <br />with the attached revegetation specifications for broadcast seeding. Please refer to the <br />seedbed preparation, broadcast seeding, mulching and crimping sections of the attached <br />revegetation specifications <br />As clarification, after seed is broadcast over the site, the seed will be raked or lightly <br />harrowed into the upper 1 /4 to 1 /2 inch of the surface. <br />The fertilizer has been eliminated from this project. <br />As clarification, all seeded areas will be mulched and crimped in accordance with the <br />revegetation specifications. <br />The Measurement and Payment description is changed to include the following: <br />The revegetated area will not be measured to the nearest .1 acreage as payment is for <br />the job price. <br />Eliminate the second sentence which reads "Payment for Task 13 will be based on the <br />unit price bid under item 13 and on the Bid Schedule and the actual number of acres <br />revegetated." <br />The job price cost will cover payment of all costs associated with each component of the <br />revegetation project. <br />10. TASK 14-REFORESTATION. One area above Pond and ditch 15-P20 will require the <br />planting of native trees to help stabilize steep slopes. The Work Description is changed <br />to include the following: <br />A total of 250 tublings will be planted above pond and ditch 15-P20. <br />Tublings will not be planted south of pond 22-P17. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.