Laserfiche WebLink
Status - Terminated <br />The revised permit application, submitted in conjunction with the <br />permit renewal and approved 11/27/89, included a hydrologic <br />monitoring plan as Exhibit 25. <br />STIPULATION NO. 3 <br />WITHIN 180 DAYS OF PERMIT ISSUANCE THE OPERATOR SHALL PROVIDE <br />DOCUMENTATION THAT THE APPROPRIATE FILINGS HAVE BEEN MADE WITH THE <br />STATE ENGINEER'S OFFICE OR APPLICABLE WATER COURT REGARDING THE <br />STORAGE AND CONSUMPTIVE USE OF WATER AT THE MINE. <br />Status - Terminated <br />This stipulation was reviewed during Permit Renewal O1, and was <br />replaced with Stipulation 13, November 27, 1989. <br />STIPULATION NO. 4 <br />WTTH RESPECT TO THAT PORTION OF THE COAL LOAD-OUT LOCATED WEST OF <br />THE COUNTY ROAD 79 IDENTIFIED AS AN ALLUVIAL VALLEY FLOOR, WITHIN <br />TWO YEARS AFTER THE COMMENCEMENT OF THE PERIOD OF EXTENDED <br />LIABILITY AS SPECIFIED IN RULE 4.15.7(5) THE OPERATOR SHALL COMPARE <br />THE SOIL CHARACTERISTICS OF THE RECLAIMED AREA WITH AN ADJACENT <br />UNDISTURBED AREA. THIS COMPARISON SHALL BE SUFFICIENT TO VERIFY <br />THAT THE INFILTRATION, PERMEABILITY, AND TEXTURAL CHARACTERISTICS <br />OF THE RECLAIMED SOILS HAVE BEEN RE-ESTABLISHED SUFFICIENTLY TO <br />RENDER THE AREA AS POTENTIALLY FLOOD IRRIGABLE. <br />Status - In Compliance, Future Submittal <br />Resolution of this stipulation is <br />commencement of the period of extended <br />been closed and was reclaimed between <br />Phase I Bond Release was approved on 2 <br />redisturbed (reseeded) in 1999 and the <br />has been restarted. <br />STIPULATION NO. S <br />due two years after the <br />liability. The loadout has <br />July and November 1996. A <br />January 1998. The area was <br />period of extended liability <br />THE OPERATOR SHALL MONITOR THE WATER LEVELS MONTHLY IN THE THOMPSON <br />WELL WATER SOURCE BEGINNING 120 DAYS PRIOR TO PILLARING OR <br />Southfield Mine Permi[ Renewal 03 <br />3 <br />