My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30958
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:22 PM
Creation date
11/23/2007 6:50:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
6/14/2001
Doc Name
Proposed Decision & Findings of Compliance for RN3
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division proposes to approve the use of such structures. <br />(4.05.04(4)(b)). <br />C. Sediment Ponds <br />As described in Section III. A. above, there are a total of <br />five ponds at t:he mine site and two at the loadout. Ponds 1, <br />4 and 5 are used to settle sediment at the mine site, while <br />ponds L-1 and L-2 are used to settle sediment at the loadout. <br />Ponds 2 and 3 are part of a closed-loop recyclable system for <br />water storage and use in the coal processing plant. Pond 3 is <br />a fresh water storage pond, receiving water pumped from the <br />Corley well while Pond 2 is primarily used as a water <br />treatment and recyclable water source for the coal processing <br />plant. <br />All sedimentation ponds have been designed utilizing standard <br />engineering practices to retain the run-off from a 10-year 24- <br />hour storm event. Pond design criteria can be found in <br />Exhibit 19 of the permit application. <br />From the 1993 Mid-term Review, the following stipulation was <br />added to update the pond as-builts: <br />Stipulation No.22 <br />THE OPERATOR WILL SUBMIT TO THE DIVISION BY JANUARY 31, 1994, <br />UPDATES TO ALL POND AS-BUILTS THAT INCLUDE ALL RECENT <br />IMPROVEMENTS ON PONDS 1,2,3,4,5 AND LOADOUT PONDS L-1 AND L-2. <br />Updated maps were received by the due date and are now <br />included in the permit application on Maps 24, 26 and 27. <br />Ponds 2 and 3 are lined with a geo-textile mat while ponds 1, <br />4 and 5 are incised into the ground. Ponds 1, 4 and 5 all <br />have primary and emergency spillways while ponds 2 and 3 do <br />not, as they are part of a water storage system. Pond 3 has <br />an underdrain that is gravity driven to supply water to Pond <br />2, where it is then used in the preparation plant. Pond 2 has <br />a discharge outlet and is NPDES point 003. Ponds 1,4 and 5 <br />are also NPDES discharge points. The two ponds at the loadout <br />are also discharge points with both primary and emergency <br />spillways. r^or further NPDES references, see Exhibit 4, <br />"Other permits". <br />Southfield Mine Permit Renewal 03 <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.