Laserfiche WebLink
Stipulation No. 25 <br />The Operator will submit a revised Map 1, which depicts the loadout <br />permit boundary. This map will be submitted as part of the ongoing <br />Technical Revision 20. <br />Status-Complied With, Terminated <br />This stipulation was complied with on 26 September 1995 with the <br />approval of Technical Revision 20, <br />Stipulation No. 26 <br />The permit boundary shall be revised in accordance with Technical <br />Revision 23, on Maps 6, 17, 19, 20 and 28. Three copies of the <br />maps shall be submitted via the minor revision process no later <br />than 10 July 1996. <br />Status - Complied With, Terminated <br />This stipulation was complied with on 19 <br />submission of updated maps 6, 17, 19, 20 <br />submitted as a separate revision, rather, <br />conjunction with Technical Revision 23. <br />Stipulation No. 27 <br />August 1996 with the <br />and 28. They were not <br />they were submitted in <br />EFCI must submit a plan that addresses the requirements of section <br />4.06.2(4) for the loadout area ponds, or submit a plan that <br />includes provisions for imported topsoil material for the loadout <br />area ponds. EFCI's proposal, in the form of a revision to the <br />permit, must be received by DMG no later than 10 July 1998. <br />Status - Complied With, Terminated <br />The required submittal date for this stipulation was extended with <br />the approval of Minor Revision 35 on 12 May 1998. The stipulation <br />was complied with on 17 July 1998 with the approval of Minor <br />Revision 38. <br />Southfield Mine Permit Renewal 03 <br />14 <br />