Laserfiche WebLink
Status - Terminated and Replaced <br />The Division initiated a reevaluation of the bond in February 1994, <br />and identified additional concerns. These concerns have been <br />identified in a new stipulation, Stipulation No. 24 (see below). <br />The bond is being reviewed pursuant to the procedures of <br />3.02.2(4). The bond estimate by the Division was completed on June <br />17, 1994 and hand delivered to the operator on June 22, 1994. <br />Stipulation No. 24 <br />AS A COMPONENT OF THE 1994 PERMIT RENEWAL AND BOND ESTIMATE REVIEW, <br />THE DIVISION HAS DETERMINED THAT THE CURRENT EFCI RECLAMATION PLAN <br />IS DEFICIENT IN THE FOLLOWING AREAS: <br />1. THE MASS BALANCE FOR THE OVERBURDEN AND TOPSOIL FOR THE FINAL <br />REFUSE PILE CONFIGURATION NEEDS TO BE CALCULATED AND IF ANY <br />DEFICIT IS FOUND, EFCI NEEDS TO SUBMIT A PLAN TO MAKE UP THE <br />DIFFERENCE IN OVERBURDEN AND TOPSOIL. <br />2. FINAL DEPOSITION OF THE ON-SITE CONCRETE NEEDS TO BE CLARIFIED <br />IN THE PERMIT. <br />3. SHOULD EFCI WISH TO PURSUE AN ALTERATION FROM THE PRESENTLY <br />APPROVED POST-MINING CONTOURS AND CONFIGURATION AT THE <br />LOADOUT, THIS ISSUE NEEDS TO SE ADDRESSED IN A TECHNICAL <br />REVISION TO BE REVIEWED AND APPROVED BY THE DIVISION. <br />4. IN ORDER TO VERIFY FACILITY BACKFILL VOLUMES, THE OPERATOR <br />WILL PROVIDE AN ACCURATE CURRENT TOPOGRAPHIC/CONTOUR MAP WITH <br />APPLICABLE CROSS-SECTIONS TO REVISE MAPS 6 AND 7. <br />THE ABOVE ISSUES ARE TO BE RESOLVED IN A REVISION(S) TO BE <br />SUBMITTED WITHIN 60 DAYS OF PERMIT RENEWAL. <br />Status-Terminated <br />This stipulation was resolved with Technical Revision 20, which was <br />approved on 22 September 1995. <br />Southfield Mine Permit Renewal 03 <br />13 <br />