Laserfiche WebLink
~S~~N <br />_- ~~_~, <br />INC. <br />- = ASrrbaidwr}~ <br />_= of <br />_ _- Weslenr FueLv <br />A.cmaalimr, hx. <br />June 17, 1996 <br />Mr. Dan Mathews <br />Division of Minerals and Geology <br />2148 Broadway, #C-5 <br />Grand Junction, CO 81503 <br />Dear Dan: <br />iiiiiiiuiiiiiuiii <br />999 <br />Please find enclosed a revised "relevant showing" letter containing the modifications mentioned in <br />your correspondence of June 7, 1996. <br />I left in the letter the references to the CFR, as that is the standards to which the roads were <br />actually built. The text then refers to the fact that the construction substantially meets the <br />requirements of the current CMLR rules. <br />Murari and I spoke on the suggested permit revision. We will work on up-dating the language as <br />suggested. Also note the change on the haul road reclamation. Murari thinks our bond already <br />covers the full reclamation cost for the road so that the change in the permit language should have ? <br />little effect on the rest of the muting permit <br />Once again, if you have any questions, please give me a call. <br />Best Regards, <br />~1L`- <br />William C. Lepro, P.E. <br />Project Engineer <br />Deserado Aline <br />P.0. Bnx 1867 <br />Rangelg Colorado 816v8 <br />Telephone 303i67i &d31 <br />Telewpier 303/6755339 <br />