GENERAL30921
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:20 PM
Creation date
11/23/2007 6:50:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
General Documents
Doc Date
9/14/1987
Doc Name
RECLAMATION SCHEDULE
From
YVCC
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• -~1 ! • • III III I II IIIIIII III 'AD.' <br />YVCC ..i <br />Yampa Valley Coal Corporation 129588 Routt County Road #27, Oak Creek, CO 80467 • (303) 879-3800 <br />September 11, 1987 <br />Dan Mathews <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 423 <br />Denver, Co 80203-2273 <br />~~C~a'tl ~i./ <br />S ~ P 141987 <br />MINED LAND <br />RECLAMATION DIVISION <br />Dear Mr. Mathews: <br />Re: Reclamation Schedule <br />During your last inspection you requested CYCC provide a schedule for <br />completing various ongoing reclamation activities at the mine. The <br />following provides a workable schedule for completing the various activities. <br />In reference to Mine No. 3, the north sedimentation pond maintenance <br />work has been completed and the pond is now being surveyed. The pond <br />certification will follow within 30-45 days of completion of the project. <br />The work on the filter fence above the Homestead Ditch at Mine 3 was <br />completed in August. <br />At Mines 1,2, and Eckman Park, the pond F excavation work will begin in <br />late October. Additional material must be excavated to meet the pond's <br />storage design. The pond certification will follow within 30-45 days of <br />completion of the project. <br />The other activities in Eckman Park include the following: channel <br />repair in areas 7, 31, 41, 51 and 51E; topsoiling in areas 9 10 and 41; <br />pit backfilling in areas 51 and 61. <br />Now that approval for the Post-mining Topography and Channel Repair <br />permit revision has been received topsoiling and channel repair can <br />commence. CYCC plans to complete most of the topsoiling in area 41 this <br />year. It is anticipated that work will then commence on Areas 9 & 10 and <br />the area 41 channel repair. Once this is completed, work will begin on the <br />other channels, depending upon severity of working conditions (primarily <br />weather}. The remaining channel repair will be done following the •1988 <br />spring runoff and all of the channels will be repaired and any remaining <br />topsoiling in areas 9, and 10 completed by the end of the 1988 field season. <br />We briefly discussed topsoiling activities in Areas 51 and 61, and I <br />would like to present additional information on these areas. Area 51 will <br />not be topsoiled until mining is completed in the area. The delay in <br />topsoiling is needed so that sufficient spoil is available for blending the <br />