Laserfiche WebLink
2O. PRIOR TO RECLAMATION OF THE MINE SITE, THE OPERATOR NEEDS TO <br />SUBMIT, IN WRITING, A REQUEST FROM THE SURFACE OWNER FOR <br />RETENTION OF A PORTION OF THE HAUL ROAD IF HAUL ROAD IS TO <br />REMAIN AS A PERMANENT STRUCTURE. <br />23. THE AMENDED RECLAMATION PLAN AND THE ASSOCIATED <br />RECLAMATION COST ESTIMATE AS REVISED PURSUANT TO TECHNICAL <br />REVISION NO. 11 ADDRESSES RECLAMATION OF THE DISTURBANCE <br />EXISTING AT THE MINE SITE ON THE DATE OF DECISION ISSUANCE <br />(MARCH 12, 1997). THE PERMIT WILL BE APPROPRIATELY REVISED, <br />AND THE RECLAMATION BOND INCREASED AS NECESSARY, PRIOR TO <br />ANY FURTHER DISTURBANCE, MODIFICATION OF EXISTING FACILITIES, <br />OR RESUMPTION OF ACTIVE STATUS FOR PURPOSES OTHER THAN <br />RECLAMATION. A REVISED BACKFILLING AND GRADING PLAN WHICH <br />WILL COMPLY WITH ALL REQUIREMENTS OF RULE 4.14 WILL BE <br />SUBMITTED TO AND APPROVED BY THE DIVISION PRIOR TO ANY <br />EXPANSION OF THE EXISTING PORTAL BENCH DISTURBANCE. <br />ACCEPTED AND AGREED: DIVISION OF MINERALS AND GEOLOGY <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />B , <br />perator Title Division Direc or <br />V'V I C~-5 <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/1D <br />M dOSSU RC\ DTM\C R N 180?0. DTM <br />