Laserfiche WebLink
ARE DEFICIENT IN THE TOPSOIL SHALL BE ADDED AFTER ONE YEAR'S <br />GROWTH OF VEGETATION AT A TIME OF YEAR APPROVED BY THE <br />DIVISION. <br />12. THE PERMITTEE SHALL MAINTAIN RAPTOR BUFFER ZONES <br />ESTABLISHED FOR THE HUNGER CANYON MINE BY THE U.S.F. W.S. <br />FOLLOWING COMPLETION OF THE INITJAL RAPTOR SURVEY <br />CONDUCTED IN JULY 1983. NO SURFACE DISTURBANCES SHALL <br />OCCUR WITHIN ESTABLISHED BUFFER ZONES EXCEPT AS SPECIFICALLY <br />AUTHORIZED BY CMLRD IN CONSULTATION WITH THE U.S.F. W.S. <br />AND C.D.O. W. <br />14. THE DIVISION REQUIRES GRAND VALLEY COAL COMPANY TO <br />COMPLETE APPROPRIATE WASTE SHEAR STRENGTH TESTS AND TO <br />SUBMIT THE RESULTS OF THOSE TESTS TO THE DIVISION FOR REVIEW <br />AND APPROVAL, IMMEDIATELY FOLLOWING THE AVAILABILITY OF <br />REPRESENTATIVE COAL PROCESSING WASTE REFUSE MATERIALS. IF <br />SIGNIFICANT MATERIAL STRENGTH VARIATION OCCURS BETWEEN THE <br />ACTUAL TEST RESULTS AND THOSE VALUES ASSUMED IN COMPLETING <br />THE STABILITY ANALYSIS INCLUDED WITHIN THE AMENDED PERMIT <br />REVISION APPLICATION, THE DIVISION WILL REQUIRE GRAND VALLEY <br />TO COMPLETE, AMENDEU STABILITY ANALYSIS AND DESIGN REVISION <br />TO THE WASTE PILE PLAN. <br />15. THE DIVISION DIRECTS GRAND VALLEY COAL COMPANY TO INSTALL <br />SIGNS AT THE PERMIT BOUNDARY AND AT STATION 67+00~ ADJOINING <br />THE HAUL ROAD. THESE SIGNS, LEGIBLE FROM THE HAUL ROAD <br />WHILE PROCEEDING TOWARD THE PORTAL, BENCH SHALL READ: <br />"ROAD SLOPES SUBJECT TO ROCKFALL AND SLOPE FAILURE-PROCEED <br />WITH CARE." <br />16. PRIOR TO CONSTRUCTION OF THE HAUL ROAD, THE APPLICANT MUST <br />PROPOSE THE INSTALLATION OF ADDITIONAL ROAD SURFACE <br />DRAINAGE CULVERTS TO MEET THE SPACING REQUIREMENTS OF RULE <br />4.03.1(4)(E)(VI)(A). ALTERNATIVE SPECIFICATIONS MAY BE UTILIZED <br />UNDER THE PROVISIONS IN RULE 4.03.1(4)(E)(VI) IF THE APPLICANT <br />DEMONSTRATES THAT THESE SPECIFICATIONS WILL NOT RESULT IN AN <br />INCREASE IN EROSION. <br />17. A PERFORMANCE BOND IN THE AMOUNT OF $691,804.00, PAYABLE TO <br />THE STATE OF COLORADO AND THE OFFICF_ OF SURFACE MINING, <br />MUST BE FILED WITH THE DIVISION NO LATER THAT 60 DAYS PRIOR TO <br />INITIATING ANY DISTURBANCE ASSOCIATED WITH THE PERMIT <br />REVISION NO. 1 (CENTRAL FACILITIES) APPROVAL. NO DISTURBANCE <br />SHALL OCCUR UNTIL THE PERFORMANCE BOND HAS BEEN APPROVED <br />AND ACCEPTED BY THE DIVISION. <br />