My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30870
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30870
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:18 PM
Creation date
11/23/2007 6:49:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
8/19/2004
Doc Name
Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVc Summary No. 13 Page 2 043-2170 <br />screen plant by the secondary crusher. <br />Poly-Flex continued deployment of 80-mil single-sided textured LLDPE geomembrane in the Phase <br />Nc OSA. Geomembrane was installed in the Phase Nc OSA on the south facing slope of Raven Hill <br />downward to the Phase IVb/IVc tie-in, Poly-Flex deployed 80-mil single-sided textured LLDPE <br />geomembrane over an azea of approximately 231,085 square feet in the Phase Nc OSA during this <br />reporting period. Geomembrane panels C-485 through C-569 were deployed, seamed, and tested by <br />Poly-Flex. Destructive fusion and extrusion seam samples DFc-174 through DFc-200 and Dec-18 <br />through DXc-21 were mazked and removed. Destructive fusion and extrusion seam peel and shear <br />testing on samples DFc-167 through DFc-187 and DXc-17 through DXc-20 were performed and passed <br />per project specification. <br />Ames continued hauling, placement and grading of DCF material into the Phase Nc OSA in the <br />western and central portion of the VLF, Raven Hill area. Ames placed DCF material and High Volume <br />Solution Collection (HVSC) piping per the project plans onto approved geomembrane panels. <br />A map of the area worked doting this reporting period is provided in Attachment C <br />Field Monitorine and Testine Activities <br />Golder observed construction activities associated with Phase Nc earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. <br />Golder observed placement, compaction, and moisture conditioning of SLF in the Phase Nc OSA for <br />subgrade preparation, thickness, compaction, moisture-content, and materials used. The Golder CQA <br />earthworks monitor performed twenty nine nuclear moisture-density tests (SLNc-142 through SLNc- <br />171) and performed six nuclear moisture-density retests on SLF that required reworking (SLNc-154x, <br />SLNc-156a, SLNc-158a, SLNc-162a, SLNc-167a, and SLNc-169a). Field test results aze presented in <br />Attachment B. <br />Golder observed geomembrane deployment, documenting ambient temperature, panel dimensions, <br />thickness, seaming, tie-in overlap, and seam testing (trial seams, pressure testing). Geomembrane <br />installed in the Phase Nc OSA met the project specification. <br />Golder visually observed the placement of DCF in the Phase Nc OSA area. Golder CQA monitors <br />(one monitor per dozer when dozers are greater than 50 feet apart) observed DCF placement and <br />verified minimum thickness of 2 feet for finish grade, and 4 feet for haul traffic (i.e., Caterpillar <br />Mode1740 articulated trucks). <br />Golder observed placement of HVSC piping in the Phase IVc OSA, verifying installation and layout <br />per the project plans. <br /> <br />PhazelVc l3 AUgu~U,AUgmt]2004 Golder Associates inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.