Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c -Golder <br />t~S.SOC121,teS <br />August 11, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Project No.: 043-2170 <br />ItE: Summary No. 13: August 1 through August 7, 2004 <br />Cressou Project Phase IVc Construction Quality Assurance <br />Dear Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of August 1 through <br />August 7, 2004. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 48° F to 55° F, and highs ranged from 70° F to 90° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Svnoysis <br />Ames Construction Ina. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nc <br />construction. Ames conducted Phase Nc construction activities on seven days of this seven-day <br />reporting period (August 1 through August 7, 2004). Poly-Flex conducted Phase Nc construction <br />activities on six days of this seven-day reporting period (August 1 through August 7, 2004). <br />Phase Nc <br />Ames continued limited Structural Fill (SF) cut to fill and slope re-contouring activities along the Phase <br />Nb /Phase Nc tie-in area above the LOB. <br />Ames hauled, placed, and compacted Soil Liner Fill (SLF) material into the Phase Nc OSA, on the east <br />sectio~l of the VLF. SLF material was tested, conditioned, reworked, retested, and maintained prior to <br />SLF surface acceptance. <br />Ames continued production of bentonite-amended SLF at the screen plant and pug mill located above <br />the Ames materials yard. Ames also continued production of Drain Cover Fill (DCF) material at the <br />Phase IVc 13 August 1-August 7, 2004 043-2170 <br />